3. Schedule and Timeline: <br />The schedule and timeline is illustrated in Figure A2 below. Note that days are given <br />as calendar, rather than work days and the start date is speculative as it will ulti- <br />mately be determined by factors outside of VEN's immediate control. Indeed, we <br />have already experienced delays related to preliminary site selection and permit- <br />ting. As per County requirements, the Pilot Study duration is 12 months (365 days); <br />with an additional 2 months to complete final reports and to finalize full-scale designs. <br />Figure A2. Project Timeline <br />bb la. Site Selection <br />Li 4jlr'2G16 `�/7i2G16 <br />lb. Water quality <br />9,11/2016 9/14/2016 <br />lc. Settling Studies <br />9/1,12016 9/14/2016 <br />ld. Procure and Construct <br />* <br />911012016 101/ 15jN116 <br />2a. Plant Add/Pilot start <br />i0j15!<'016liil/2015 <br />2b. Pilot Performance Monitoring <br />11/1/2016 1/1/2017 <br />eV <br />2c. Report and Pres. <br />12,'15/016 - 12/30/2016 <br />h <br />_ 3a. Plant downselect,clarifier <br />w y <br />1/1/201 1181201) <br />F� <br />:, <br />for <br />Moniloria 1, 1, 20, ;1 :017 <br />,f <br />3d. Pilot Stop, Disassemble, 911!2017 9/8;2017 <br />3e. Data Analysis and Report: 9!8/2017-10/8,120F <br />C <br />7 <br />4a. <br />Preliminary Full Scale Design and Report <br />10/8'2017 - <br />11/�,,,G 17 <br />Day 1 63 125 187 <br />249 311 373 <br />2017 <br />4; 1r101t 1/i%2017 <br />0!1!2017 <br />Project Start Plant Downselect <br />Pilot Field <br />Optimized Pilot Field <br />Operations End <br />1/x/ 017 <br />l <br />Pilot Field Operations Start <br />Operation Start <br />Prelim. Full <br />Sale Design <br />9 272 <br />