My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1992
CBCC
>
Meetings
>
1990's
>
1992
>
7/14/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:32 PM
Creation date
6/8/2015 10:53:49 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/14/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUL 14,1992 - <br />BOOK 6 6 F„6E�Z 9 <br />Chairman Eggert opened the Public Hearing and asked if anyone <br />wished to be heard in this matter. <br />Peter Cassara, 3196 4th Street, advised that his residence <br />faces 32nd Avenue. He asked why this is just being approved now <br />when the job already has begun. <br />Civil Engineer Michelle Gentile advised that no construction <br />has begun, but Mr. Cassara explained that he is familiar with road <br />construction and the County is grading it and bringing dirt in. <br />Mrs. Gentile believed that due to the recent heavy rains, Road <br />& Bridge Dept. may be out there cutting the swales and eliminating <br />some of the drainage problems they are having in that area. <br />Mr. Cassara emphasized that they are putting in the elevations <br />which is preliminary work for road construction. <br />Mrs. Gentile explained that we still need to apply for a <br />stormwater permit and have not completed our plans for <br />construction. The plans are approximately 50% completed, however, <br />and we do know what the elevations will be. <br />Commissioner Scurlock felt the question is whether Road & <br />Bridge is out there working and have shot the elevations and are <br />bringing it to that grade. <br />Mrs. Gentile answered no, at least not to her knowledge. <br />Engineering has not supplied Road & Bridge with any plans for the <br />construction and road improvements out there. <br />Engineer Mike Dudeck advised that Road & Bridge is doing work <br />out there, but it is maintenance, not part of the construction <br />project. None of the work they are doing out there now will show <br />up on the assessment. <br />Commissioner Scurlock felt that if they are doing a major <br />drainage project, they should be coordinating that with a future <br />project that is coming along. That should be happening, but it <br />should not be happening prior to approval. <br />Administrator Chandler noted that we still have an obligation <br />to maintain the roadways out there, and he assumed that is what we <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.