My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER as to the Work, it is intended that such materials, op equipment, shall mean to fumish <br /> action or determination will be solely to evaluate, in a,ad iRstalt- said sees, materials--81 <br /> general, the completed Work for compliance with e I .pment Gomplete and Feady for in ended <br /> the requirements of and information in the Contract <br /> Documents and conformance with the design <br /> concept of the completed Project as a functioning 4. When "furnish," "install," "perform," or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context clearly <br /> indicating otherwise). The use of any such term or requiring an obligation of CONTRACTOR, <br /> adjective shall not be effective to assign to ENGI- "provide" is implied. <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9.10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning. <br /> B. Day <br /> 1. The word "day" shall constitute a ARTICLE 2- PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2.01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the executed <br /> 1. The word "defective,"when modifying Agreements to OWNER, CONTRACTOR shall also <br /> the word "Work," refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish. <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, 2.02 Copies of Documents <br /> reference standard, test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> mendation of final payment (unless responsi- copies will be furnished upon request at the cost of <br /> bility for the protection thereof has been reproduction. <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2.03 Commencement of Contract Times,Notice <br /> 14.04 or 14.05). to Proceed <br /> D. Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1. The wGrd=fAFRi6h," wheR used in ment or, if a Notice to Proceed is given, on the day <br /> GGnnestaeR With searlGes, materials, er indicated in the Notice to Proceed. A Notice to Pro- <br /> ceed may be given at any time within 30 days after the <br /> said sewiGes, materials, q ipment to the Effective Date of the Agreement. In no event will the <br /> Contract Times commence to run later than the <br /> use A_.r RStallat;GR and 'R usable or epeFable ninetieth day after the day of Bid opening or the <br /> sead+taer. thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> 2. The—we,dirastall," who. used in <br /> Gonnestlen—with sews, rnaterials, er 2.04 Starting the Work <br /> A. CONTRACTOR shall start to perform the <br /> ea}pl <br /> egt er _Gete and ready f^F iRtended Work on the date when the Contract Times com- <br /> mence to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 3. The—wards—"peFform" er—"pFGvideF" run. <br /> when used in GGRReGti9n with seFVises, <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-8 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid documents\LAP Documents\Master Contract <br /> Documents\00700-General Conditions REV 510-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.