My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 Before Starting Construction 2.06 Preconstruction Conference <br /> A. CONTRACTOR's Review of Contract Docu .41. %Alathin _20 days after the C;ontFaGt Times sta <br /> - <br /> ments: Before undertaking each part of the Work, tG FUR, but before aRY Work at the Site is staFted <br /> CONTRACTOR shall carefully study and compare then.c3e _#ended by CONTRACTOR, ENGINE <br /> Contract Documents and check and verify pertinent `'� ":.oll " elm' establish ate ,,. .._- held .. <br /> figures therein and all applicable field measurements. w <br /> CONTRACTOR shall promptly report in writing to I.Ve.rk ;qnd to discuss the SGhedules referred to in p <br /> ENGINEER any conflict, error, ambiguity, or <br /> discrepancy which CONTRACTOR may discover and and ether submittals, PFGGeSSiRg ApptiGafions--fer <br /> shall obtain a written interpretation or clarification from Payment, and maintaining <br /> ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable 2.07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents, at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B. Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI- <br /> the Effective Date of the Agreement(unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements), CONTRAC- accordance with paragraph 2.05.B. CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1. a preliminary progress schedule schedules. No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified <br /> in the Contract Documents, 1. The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2. a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times. Such acceptance will not <br /> mitting, reviewing, and processing such impose on ENGINEER responsibility for the <br /> submittal; and progress schedule, for sequencing, scheduling, <br /> or progress of the Work nor interfere with or <br /> 3. a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2. CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals. <br /> and profit applicable to each item of Work. <br /> 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site ' gt rted CONTRACTOR and OWNER shall and substance if it provides a reasonable <br /> earl deliveF to the other, With GGpies to eaGh allocation of the Contract Price to component <br /> parts of the Work. <br /> ey <br /> CONTRACTOR and OWNER FespeGtN�� <br /> AFtiGle5. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-9 <br /> F:\PublicWorkskENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21 sl Court)\Admim\bid documentskiAP Documents\Master Contract <br /> Documents\00700-General Conditions REV 5-10-13.doc <br />