Laserfiche WebLink
ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES <br /> 6.03 Services, Materials, and Equipment <br /> 6.01 Supervision and Superintendence A. Unless otherwise specified in the General Re- <br /> quirements, CONTRACTOR shall provide and <br /> A. CONTRACTOR shall supervise, inspect, and assume full responsibility for all services, materials, <br /> direct the Work competently and efficiently, devoting equipment, labor, transportation, construction <br /> such attention thereto and applying such skills and equipment and machinery, tools, appliances, fuel, <br /> expertise as may be necessary to perform the Work in power, light, heat, telephone, water, sanitary facilities, <br /> accordance with the Contract Documents. CON- temporary facilities, and all other facilities and <br /> TRACTOR shall be solely responsible for the means, incidentals necessary for the performance, testing, <br /> methods, techniques, sequences, and procedures of start-up, and completion of the Work. <br /> construction, but CONTRACTOR shall not be <br /> responsible for the negligence of OWNER or B. All materials and equipment incorporated into <br /> ENGINEER in the design or specification of a specific the Work shall be as specified or, if not specified, shall <br /> means, method, technique, sequence, or procedure of be of good quality and new, except as otherwise <br /> construction which is shown or indicated in and provided in the Contract Documents. All warranties <br /> expressly required by the Contract Documents. CON- and guarantees specifically called for by the Specifica- <br /> TRACTOR shall be responsible to see that the tions shall expressly run to the benefit of OWNER. If <br /> completed Work complies accurately with the Contract required by ENGINEER, CONTRACTOR shall furnish <br /> Documents. satisfactory evidence (including reports of required <br /> tests) as to the source, kind, and quality of materials <br /> B. At all times during the progress of the Work, and equipment. All materials and equipment shall be <br /> CONTRACTOR shall assign a competent resident stored, applied, installed, connected, erected, <br /> superintendent thereto who shall not be replaced protected, used, cleaned, and conditioned in <br /> without written notice to OWNER and ENGINEER accordance with instructions of the applicable <br /> except under extraordinary circumstances. The Supplier, except as otherwise may be provided in the <br /> superintendent will be CONTRACTOR's Contract Documents. <br /> representative at the Site and shall have authority to <br /> act on behalf of CONTRACTOR. All communications 6.04 Progress Schedule <br /> given to or received from the superintendent shall be <br /> binding on CONTRACTOR. A. CONTRACTOR shall adhere to the progress <br /> schedule established in accordance with paragraph <br /> 6.02 Labor, Working Hours 2.07 as it may be adjusted from time to time as <br /> provided below. <br /> A. CONTRACTOR shall provide competent, <br /> suitably qualified personnel to survey, lay out, and 1. CONTRACTOR shall submit to <br /> construct the Work as required by the Contract Docu- ENGINEER for acceptance (to the extent indi- <br /> ments. CONTRACTOR shall at all times maintain cated in paragraph 2.07) proposed adjustments <br /> good discipline and order at the Site. in the progress schedule that will not result in <br /> changing the Contract Times (or Milestones). <br /> B. Except as otherwise required for the safety or Such adjustments will conform generally to the <br /> protection of persons or the Work or property at the progress schedule then in effect and additional- <br /> Site or adjacent thereto, and except as otherwise ly will comply with any provisions of the General <br /> stated in the Contract Documents, all Work at the Site Requirements applicable thereto. <br /> shall be performed during regular working hours, and <br /> CONTRACTOR will not permit overtime work or the 2. Proposed adjustments in the <br /> performance of Work on Saturday, Sunday, or any progress schedule that will change the Contract <br /> legal holiday without OWNER's written consent(which Times (or Milestones) shall be submitted in <br /> will not be unreasonably withheld) given after prior accordance with the requirements of Article 12. <br /> written notice to ENGINEER. Such adjustments may only be made by a <br /> Change Order or Written Amendment in accor- <br /> dance with Article 12. <br /> 00700-General Conditions REV 510-13 <br /> 00700-19 <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS11049_8th St Sidewalk Improvements(58th Ave to 21st CourQ\Ndmim\bid documents\LAP DocumentsWlaster Contract <br /> ume <br /> Docnts\00700-General Conditions REV 5-10-13.doc <br />