My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. CONTRACTOR shall submit suffi- <br /> 6.05 Substitutes and "Or-Equals" cient information as provided below to allow <br /> ENGINEER to determine that the item of <br /> A. Whenever an item of material or equipment is material or equipment proposed is <br /> specified or described in the Contract Documents by essentially equivalent to that named and an <br /> using the name of a proprietary item or the name of a acceptable substitute therefor. Requests for <br /> particular Supplier, the specification or description is review of proposed substitute items of <br /> intended to establish the type, function, appearance, material or equipment will not be accepted <br /> and quality required. Unless the specification or by ENGINEER from anyone other than <br /> description contains or is followed by words reading CONTRACTOR. <br /> that no like, equivalent, or "or-equal". item or no <br /> substitution is permitted, other items of material or c. The procedure for review by ENGI- <br /> equipment or material or equipment of other Suppliers NEER will be as set forth in paragraph <br /> may be submitted to ENGINEER for review under the 6.05.A.2.d, as supplemented in the General <br /> circumstances described below. Requirements and as ENGINEER may <br /> decide is appropriate under the <br /> 1. "Or-Equal" Items: If in ENGINEER's circumstances. <br /> sole discretion an item of material or equipment <br /> proposed by CONTRACTOR is functionally d. CONTRACTOR shall first make <br /> equal to that named and sufficiently similar so written application to ENGINEER for review <br /> that no change in related Work will be required, of a proposed substitute item of material or <br /> it may be considered by ENGINEER as an equipment that CONTRACTOR seeks to <br /> "or-equal" item, in which case review and furnish or use. The application shall certify <br /> approval of the proposed item may, in that the proposed substitute item will <br /> ENGINEER's sole discretion, be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substi- design, be similar in substance to that <br /> tute items. For the purposes of this paragraph specified, and be suited to the same use as <br /> 6.05.A.1, a proposed item of material or that specified. The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if: posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a. in the exercise of reasonable tial Completion on time, whether or not use <br /> judgment ENGINEER determines that: (i) it of the proposed substitute item in the Work <br /> is at least equal in quality, durability, will require a change in any of the Contract <br /> appearance, strength, and design Documents (or in the provisions of any other <br /> characteristics; (ii) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole, and; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is Bub- <br /> b. CONTRACTOR certifies that: (i) ject to payment of any license fee or royalty. <br /> there is no increase in cost to the OWNER; All variations of the proposed substitute <br /> and (ii) it will conform substantially, even item from that specified will be identified in <br /> with deviations, to the detailed requirements the application, and available engineering, <br /> of the item named in the Contract sales, maintenance, repair, and <br /> Documents. replacement services will be indicated. The <br /> application will also contain an itemized esti- <br /> 2. Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> a. If in ENGINEER's sole discretion an substitute item, including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change, all of which will be <br /> "or-equal" item under paragraph 6.05.A.1, it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item. ENGINEER may <br /> item. require CONTRACTOR to furnish additional <br /> data about the proposed substitute item. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-20 <br /> RXPublic Works\ENGINEERING DIVISION PROJECTS11049_8th Sl Sidewalk Improvements(58th Ave to 21 st Court)W.dmim\bid documents\LAP DocumentsWaster Contract <br /> Documents\00700-General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.