I <br /> I <br /> 1 <br /> replacement, against whom OWNER may have j <br /> B. Substitute Construction Methods or Proce- reasonable objection. CONTRACTOR shall not be <br /> dures: If a specific means, method, technique, se- required to employ any Subcontractor, Supplier, or <br /> quence, or procedure of construction is shown or other individual or entity to furnish or perform any of <br /> indicated in and expressly required by the Contract the Work against whom CONTRACTOR has reason- <br /> Documents, CONTRACTOR may furnish or utilize a able objection. ; <br /> substitute means, method, technique, sequence, or <br /> procedure of construction approved by ENGINEER. B. If the Supplementary Conditions require the <br /> CONTRACTOR shall submit sufficient information to identity of certain Subcontractors, Suppliers, or other <br /> allow ENGINEER, in ENGINEER's sole discretion, to individuals or entities to be submitted to OWNER in <br /> determine that the substitute proposed is equivalent to advance for acceptance by OWNER by a specified <br /> that expressly called for by the Contract Documents. date prior to the Effective Date of the Agreement, and <br /> The procedure for review by ENGINEER will be similar if CONTRACTOR has submitted a list thereof in <br /> to that provided in subparagraph 6.05.A.2. accordance with the Supplementary Conditions, <br /> OWNER's acceptance (either in writing or by failing to <br /> C. Engineer's Evaluation: ENGINEER will be make written objection thereto by the date indicated <br /> allowed a reasonable time within which to evaluate for acceptance or objection in the Bidding Documents <br /> each proposal or submittal made pursuant to para- or the Contract Documents) of any such Subcon- <br /> graphs 6.05.A and 6.05.B. ENGINEER will be the tractor, Supplier, or other individual or entity so <br /> sole judge of acceptability. No"or-equal" or substitute identified may be revoked on the basis of reasonable <br /> will be ordered, installed or utilized until ENGINEER's objection after due investigation. CONTRACTOR <br /> review is complete, which will be evidenced by either a shall submit an acceptable replacement for the <br /> Change Order for a substitute or an approved Shop rejected Subcontractor, Supplier, or other individual or <br /> Drawing for an "or equal." ENGINEER will advise entity, and the Contract Price will be adjusted by the <br /> CONTRACTOR in writing of any negative difference in the cost occasioned by such <br /> determination. replacement, and an appropriate Change Order will be <br /> issued or Written Amendment signed. No acceptance <br /> D. Special Guarantee: OWNER may require by OWNER of any such Subcontractor, Supplier, or <br /> CONTRACTOR to furnish at CONTRACTOR's ex- other individual or entity, whether initially or as a <br /> pense a special performance guarantee or other replacement, shall constitute a waiver of any right of <br /> surety with respect to any substitute. OWNER or ENGINEER to reject defective Work. <br /> E. ENGINEER's Cost Reimbursement., C. CONTRACTOR shall be fully responsible to <br /> ENGINEER will record time required by ENGINEER OWNER and ENGINEER for all acts and omissions of <br /> and ENGINEER's Consultants in evaluating substitute the Subcontractors, Suppliers, and other individuals or <br /> proposed or submitted by CONTRACTOR pursuant to entities performing or furnishing any of the Work just <br /> paragraphs 6.05.A.2 and 6.05.13 and in making as CONTRACTOR is responsible for <br /> changes in the Contract Documents (or in the CONTRACTOR's own acts and omissions. Nothing in <br /> provisions of any other direct contract with OWNER the Contract Documents shall create for the benefit of <br /> for work on the Project) occasioned thereby. Whether any such Subcontractor, Supplier, or other individual <br /> or not ENGINEER approves a substitute item so pro- or entity any contractual relationship between OWNER <br /> posed or submitted by CONTRACTOR, CON- or ENGINEER and any such Subcontractor, Supplier <br /> TRACTOR shall reimburse OWNER for the charges or other individual or entity, nor shall it create any <br /> of ENGINEER and ENGINEER's Consultants for obligation on the part of OWNER or ENGINEER to <br /> evaluating each such proposed substitute. pay or to see to the payment of any moneys due any <br /> such Subcontractor, Supplier, or other individual or <br /> F. CONTRACTOR's Expense: CONTRACTOR entity except as may otherwise be required by Laws <br /> shall provide all data in support of any proposed and Regulations. <br /> substitute or"or-equal"at CONTRACTOR's expense. <br /> D. CONTRACTOR shall be solely responsible <br /> 6.06 Concerning Subcontractors, Suppliers, for scheduling and coordinating the Work of Subcon <br /> and Others tractors, Suppliers, and other individuals or entities <br /> performing or furnishing any of the Work under a <br /> A. CONTRACTOR shall not employ any direct or indirect contract with CONTRACTOR. <br /> Subcontractor, Supplier, or other individual or entity <br /> (including those acceptable to OWNER as indicated in E. CONTRACTOR shall require all Subcontrac- <br /> paragraph 6.06.B), whether initially or as a tors, Suppliers, and such other individuals or entities <br /> 00700-General Conditions REV 510-13 <br /> 00700-21 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS11G49_81h St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid documents\LAP DocumentsWasler Contract <br /> Documents100700-General Conditions REV 5ID-13.doc <br />