My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. for costs incurred under para- 12.03 Delays Beyond CONTRACTOR's Control <br /> graphs 11.01.A.1 and 11.01.A.2, the <br /> CONTRACTOR's fee shall be 15 percent; A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract <br /> b. for costs incurred under paragraph Times (or Milestones) due to delay beyond the control <br /> 11.01.A.3, the CONTRACTOR's fee shall of CONTRACTOR, the Contract Times (or <br /> be five percent; Milestones)will be extended in an amount equal to the <br /> time lost due to such delay if a Claim is made therefor <br /> c. where one or more tiers of subcon- as provided in paragraph 12.02.A. Delays beyond the <br /> tracts are on the basis of Cost of the Work control of CONTRACTOR shall include, but not be <br /> plus a fee and no fixed fee is agreed upon, limited to, acts or neglect by OWNER, acts or neglect <br /> the intent of paragraph 12.01.C.2.a is that of utility owners or other contractors performing other <br /> the Subcontractor who actually performs work as contemplated by Article 7, fires, floods, <br /> the Work, at whatever tier, will be paid a fee epidemics, abnormal weather conditions, or acts of <br /> of 15 percent of the costs incurred by such God. <br /> Subcontractor under paragraphs 11.01.A.1 <br /> and 11.01.A.2 and that any higher tier 12.04 Delays Within CONTRACTOR's Control <br /> Subcontractor and CONTRACTOR will <br /> each be paid a fee of five percent of the A. The Contract Times(or Milestones)will not be <br /> amount paid to the next lower tier Subcon- extended due to delays within the control of <br /> tractor; CONTRACTOR. Delays attributable to and within the <br /> control of a Subcontractor or Supplier shall be <br /> d. no fee shall be payable on the deemed to be delays within the control of CONTRAC- <br /> basis of costs itemized under paragraphs TOR. <br /> 11.01.A.4, 11.01.A.5, and 11.01.13; <br /> 12.05 Delays Beyond OWNER's and <br /> e. the amount of credit to be allowed CONTRACTOR's Control <br /> by CONTRACTOR to OWNER for any <br /> change which results in a net decrease in A. Where CONTRACTOR is prevented from <br /> cost will be the amount of the actual net completing any part of the Work within the Contract <br /> decrease in cost plus a deduction in Times (or Milestones) due to delay beyond the control <br /> CONTRACTOR's fee by an amount equal of both OWNER and CONTRACTOR, an extension of <br /> to five percent of such net decrease; and the Contract Times (or Milestones) in an amount <br /> equal to the time lost due to such delay shall be <br /> f. when both additions and credits are CONTRACTOR's sole and exclusive remedy for such <br /> involved in any one change, the adjustment delay. <br /> in CONTRACTOR's fee shall be computed <br /> on the basis of the net change in 12.06 Delay Damages <br /> accordance with paragraphs 12.01.C.2.a <br /> through 12.01.C.2.e, inclusive. A. In no event shall OWNER or ENGINEER be <br /> liable to CONTRACTOR, any Subcontractor, any <br /> 12.02 Change of Contract Times Supplier, or any other person or organization, or to any <br /> surety for or employee or agent of any of them, for <br /> A. The Contract Times (or Milestones) may only damages arising out of or resulting from: <br /> be changed by a Change Order or by a Written <br /> Amendment. Any Claim for an adjustment in the 1. delays caused by or within the control <br /> Contract Times (or Milestones) shall be based on of CONTRACTOR; or <br /> written notice submitted by the party making the claim <br /> to the ENGINEER and the other party to the Contract 2. delays beyond the control of both <br /> in accordance with the provisions of paragraph 10.05. OWNER and CONTRACTOR including but not <br /> limited to fires, floods, epidemics, abnormal <br /> B. Any adjustment of the Contract Times (or weather conditions, acts of God, or acts or <br /> Milestones) covered by a Change Order or of any neglect by utility owners or other contractors <br /> Claim for an adjustment in the Contract Times (or performing other work as contemplated by <br /> Milestones) will be determined in accordance with the Article 7. <br /> provisions of this Article 12. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-35 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1049 8th St Sidewalk Improvements(58th Ave to 21 st Court)Wdmim\bld documents\LAP DocumentsWaster Contract <br /> Documents\00700-General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.