My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SECTION 01009 I <br /> I <br /> SPECIAL PROVISIONS <br /> 1.1 GENERAL <br /> A. Visits to the construction site may be made by representatives of permitting or <br /> governing bodies. Submit details of all instructions from the above to the ENGINEER <br /> immediately. The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction. <br /> B. Furnish sufficient labor, construction equipment and materials, and work such hours, <br /> including night shifts and overtime operations, as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule. If, in the <br /> opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take <br /> such steps as may be necessary to improve progress, all without additional cost to the <br /> OWNER. The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions, SC-6.02. <br /> C. All salvageable material and equipment for which specific use, relocation or other i <br /> disposal is not specifically noted, shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location: 4550 41St Street, at the <br /> CONTRACTOR's expense. All material and equipment not in salvageable condition, as <br /> determined by the ENGINEER and the OWNER, shall be disposed of by the <br /> CONTRACTOR, at the CONTRACTOR's expense. <br /> D. In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency, St. Johns River Water Management District, Department of <br /> Environmental Protection, Army Corps of Engineers, Indian River Farms Water Control <br /> District, and all other applicable State or Federal agencies' specifications and permits. <br /> In the event of a conflict, the more stringent specification or requirement shall govern. <br /> E. Before performing any work outside the designated limits of the work site, secure any <br /> necessary permits and authorization from the applicable owner, or verify in writing that <br /> such has been previously obtained. Follow all requirements of any said permits or <br /> authorization. Give the ENGINEER and appropriate owner ten (10) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site. <br /> I <br /> c <br /> i <br /> 01009-1 01009-Special Provisions ' <br /> F:\Public Works\ENGINEER[NG DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\AdmimUd documents\LAP i <br /> Documents\Master Contract Documents\01009- I <br /> Special Provisions.doc i. <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.