Laserfiche WebLink
SECTION 01024 <br /> FORCE ACCOUNT <br /> 1.1 General <br /> i <br /> CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br /> necessary to perform additional work not covered on the Contract Drawings. <br /> The force Account is intended as a contingency for unforeseen work. <br /> 1.1 PAYMENT <br /> A. Lump sum amount for force account work is included in the bid schedule. <br /> The value of force account work will be determined in accordance with Article <br /> 12 of the General Conditions. <br /> I <br /> + + END OF SECTION + + <br /> i <br /> i <br /> I <br /> ` II <br /> - i <br /> i <br /> i <br /> 01024- 1 <br /> FA1Public Works\ENGINEERING DIVISION PROJECTS\I049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid <br /> documents\LAP Documents\Master Contract Documents\01024-Force Account.doc <br />