My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> SECTION 01310 <br /> CONSTRUCTION SCHEDULES <br /> 1.1 GENERAL REQUIREMENTS <br /> A. No partial payments shall be approved by the ENGINEER until there is an i <br /> approved construction progress schedule on hand. <br /> I <br /> I <br /> B. Designate an authorized representative who shall be responsible for <br /> development and maintenance of the schedule and of all progress and <br /> payment reports. This representative shall have direct project control and <br /> complete authority to act on behalf of the CONTRACTOR in fulfilling the <br /> commitments of the CONTRACTOR's schedules. <br /> 1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br /> I <br /> When the ENGINEER requires the CONTRACTOR to submit revised (updated) j <br /> progress schedules on a monthly basis the CONTRACTOR shall: <br /> A. Indicate the progress of each activity to the date of submission. <br /> B. Show changes occurring since the previous submission listing: <br /> 1. Major changes in scope. <br /> 2. Activities modified since the previous submission. I <br /> 3. Revised projections of progress and completion. <br /> 4. Other identifiable changes. <br /> i <br /> C. Provide a narrative report as needed to define: l <br /> 1. Problem areas, anticipated delays, and the impact on the schedule. <br /> 2. Corrective action recommended and its effect. <br /> 3. The effect of changes on schedules of other prime contractors. <br /> 1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br /> On or before the tenth day after the effective date of the Agreement, submit the I <br /> initial schedules to the ENGINEER. The ENGINEER will review the schedules i <br /> and return a review copy to the CONTRACTOR within 21 days after receipt. If j <br /> required by the ENGINEER, resubmit revised schedules on or before the <br /> seventh day after receipt of the review copy. If required by the ENGINEER, <br /> submit revised monthly progress schedules with that month's application for <br /> payment. <br /> I <br /> 01310-1 01310 Construction Schedule <br /> i <br /> F:\PublicWorks\FzNGlNEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid j <br /> documents\iAP Documents\Master Contract Documents\01310-Construction Schedule.doc i <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.