My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> A. After receiving approval by the ENGINEER, distribute copies of the <br /> approved initial schedule and all reviewed revisions (updated) to: <br /> 1. Job site file. <br /> 2. Subcontractors. <br /> 3. Other concerned parties. <br /> 4. OWNER (two copies). <br /> 5. ENGINEER <br /> B. In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR, in writing, any problems anticipated by the projections <br /> shown in the schedules. <br /> + + END OF SECTION + + <br /> i <br /> i <br /> i <br /> I <br /> i <br /> 01310-2 01310 Construction Schedule <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid <br /> documents\LAP Documents\Master Contract Documents\01310-construction Schedule.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.