My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Field engineering and layout shall be in conformance to Section 01050, Field <br /> Engineering and Layout of Division 1, General Requirements. <br /> C. Public Construction Bond shall be done and conform to Section 00610— Public <br /> Construction Bond <br /> D. Trench Safety Compliance (Over 6) shall be done and comply to Section 00454 <br /> — Sworn Statement under the Florida Trench Safety Act <br /> E. Trench Safety Compliance (Shoring)shall be done and comply to Section 00454 <br /> — Sworn Statement under the Florida Trench Safety Act <br /> GENERAL i <br /> Maintain, prepare and provide the ENGINEER with record documents as specified below, <br /> except where otherwise specified or modified within the scope of work provided in the <br /> specific project contract documents. The Contractor and/or Developer shall be responsible <br /> for, and required to provide, Record Drawings as outlined in this section. <br /> i <br /> MAINTENANCE OF RECORD DOCUMENTS: <br /> 1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br /> complete sets of the following project documents: Drawings, Specifications, { <br /> Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br /> other modifications of Contract Documents, test records, survey data, Field { <br /> Orders, and all other documents pertinent to CONTRACTOR'S Work. <br /> 2. Provide files and racks for proper storage and easy access. <br /> 3. Make documents available at all times for inspection by ENGINEER and j <br /> OWNER. <br /> 4. Do not use record documents for any other purpose and do not remove them <br /> from the field office. <br /> 5. Label each document "RECORD DRAWING" in 2-inch high printed letters. <br /> 6. Keep record documents current at all times. i <br /> 7. No work shall be permanently concealed until the required record data has <br /> been obtained. <br /> RECORD / AS-BUILT DRAWINGS <br /> i <br /> A. During the construction operation, the CONTRACTOR shall maintain records j <br /> of all deviations from the approved Project Plans and Specifications and shall <br /> prepare therefrom "RECORD" drawings showing correctly and accurately all <br /> changes and deviations from the work made during construction to reflect the work <br /> as it was actually constructed. <br /> B. The Record/As-Built survey shall be performed and subsequent plans j <br /> prepared by a Professional Surveyor and Mapper, registered in the state of <br /> Florida and certified to the standards set forth in Chapter 472, Florida Statutes and i <br /> Chapter 5J-17.050 Florida Administrative Code (Florida Minimum Technical <br /> Standards). I <br /> 01025-2 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)Vldmim\bid <br /> documents\LAP Documents\Master Contract Documents\Technical Specifications.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.