Laserfiche WebLink
ATTACHMENT C <br />Orlando UMlea Commission Discussion Points in <br />Page 1 of 3 <br />Response to City of Vero Beach Reaped for Additional Options for Modification to PPA <br />November 25, 2011 <br />Source of Capacity/Energy: <br />Remain as OUC system sale, for both the Base Capacity and the Peeling <br />Capacity. <br />Term: <br />gtase Capacity. Beginning on the Amendment Effective Date and <br />continuing through December 31, 2023. <br />Peaking Capacity Beginning upon the Amendment Effective Date and <br />continuing through December 31, 2023. <br />Contract Capacity: <br />Rase Cavacity: 85 MW minimum take requirement, with the capacity <br />calculated as is currently provided in the PPA (substituting the Peaking <br />Capacity for the Vero combined cycle generation). <br />New Peaking Capacity: 54 MW of peaking capacity based on a heat rate of <br />11,500 Btu/KWH. <br />Capacity Charges <br />See Attachment A <br />Energy Charge <br />Base Energy Charge: Calculated as is =reedy in the PPA <br />Peskin Energy Charge: <br />The Hourly Energy Rate ($/MWH) — [(Index + $0.78) • 115] + $5/MWH <br />VOM <br />Index = [Florida Zone 3 midpoint e8 posted in Plait's Gas Daily under <br />Louisiana onshore -South diVided by (1- FGT Peel Surcharge affective for <br />that month in the Delivery Period)] + FG'r's FPS -1 Usage Rate effective fbr <br />that month in the Delivery Faded <br />Transmission Charge <br />Hesse {Mussily. OUC published tariff <br />OUC published.tari$ <br />• <br />