Laserfiche WebLink
• <br />• <br />ATTACHMENT C <br />Page 2 of 3 <br />Orlando Utilities Commission Discussion points in <br />Response to City of Vero Beach Request for Additional Options for Modification to PPA <br />November 25, 2014 <br />Delivery Point for Capacity/Energy <br />Same as in PPA currently for both Base Capacity and Peaking Capacity <br />(OUC-FPL int ca ion). <br />Conditions of OUC Offer <br />1) Vero to retire the Vero Power Plant upon completion of any applicable <br />bion reliability upgrades, with the plant capamity removed from <br />the PPA as an available resource far Vero as of the Amendment <br />Effective Date. <br />2) Upon expiration of the PPA'e, the natural gas transportation rights <br />assigned to OUC would remain with OUC unless Vero builds gas-fired <br />generation at the existing Vero Power Plant site by December 31, 2024 <br />to serve its native load, in which case Vero can request the natural gas <br />transportation rights to be assigned back to Vero. <br />3) Vero shall obtain network transmission service from FPL for Peaking <br />Capacity from the Delivery Point to the load. <br />4) OUC shall obtain firm transmission service over the OUC transmission <br />system for the Peaking City to the Delivery Point <br />5) Subject to negotiation and agreement on definitive centred terms and <br />approval <br />� by the Board of OUC and the City of Vero Beach City <br />1. 4 <br />Page 2 <br />