Laserfiche WebLink
HM I MASTELLER & MOLER INC. <br />M —CIVIL ENGINEERS — <br />23rd Street SW Roadway Improvements <br />CERTIFIED PERFORMANCE BOND COST ESTIMATE <br />Reference: "23rd Street SW Roadway Improvement Plans," Masteller & Moler, Inc., dated December 3, 2015. <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />1 <br />Mobilization <br />1 <br />LS <br />$ <br />6,500.00 <br />$ <br />6,500.00 <br />2 <br />Erosion Control <br />1 <br />LS <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />3 <br />Clearing& Grubbin <br />085 <br />Acre <br />$ <br />3,250.00 <br />$ <br />2,762.50 <br />4 <br />Demolish Existing Asphalt <br />2,050 <br />SY <br />$ <br />5.00 <br />$ <br />10,250.00 <br />5 <br />Import Fill <br />2,500 <br />CY <br />$ <br />9.00 <br />$ <br />22,500.00 <br />6 <br />Rough Grade <br />7,200 <br />SY <br />$ <br />1.00 <br />$ <br />7,200.00 <br />7 <br />Finish Grade <br />7,200 <br />SY <br />$ <br />1.35 <br />$ <br />9,720.00 <br />8 <br />Storm Inlet - Type "C"3 <br />EA <br />$ <br />2,200.00 <br />$ <br />6,600.00 <br />9 <br />Storm Pipe - RCP 18" <br />300 <br />LF <br />$ <br />36.00 <br />$ <br />10,800.00 <br />10 <br />Storm Pipe - CAP 18" <br />190 <br />LF <br />$ <br />30.00 <br />$ <br />5,700.00 <br />11 <br />Dewaterinq & Lake Installation of Pie <br />1 <br />LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />12 <br />Sod: Swales & Disturbed Areas <br />4,200 <br />SY <br />$ <br />2.25 <br />$ <br />9,450.00 <br />13 <br />Asphalt -1 0" SP 9.5 <br />3,105 <br />SY <br />$ <br />5.70 <br />$ <br />17,698.50 <br />14 <br />Asphalt - 1.5" SP 12.5 <br />3,106 <br />SY <br />$ <br />8.55 <br />$ <br />26,556.30 <br />15 <br />8" Rock Base <br />2,970 <br />SY <br />$13.00 <br />$ <br />38,610.00 <br />16 <br />12" Stabilized Sub rade <br />3,050 <br />SY <br />$ <br />5.25 <br />$ <br />16,012.50 <br />17 <br />Adjust Fire H drant <br />2 <br />EA <br />$ <br />1,500.00 <br />$ <br />3,000.00 <br />18 <br />Driveway - 6" Concrete <br />51 <br />SY <br />$ <br />45.00 <br />$ <br />2,295.06- <br />19 <br />Sidewalk - 6" Concrete <br />638 <br />SY <br />$ <br />45.00 <br />$ <br />28,710.00 <br />20 <br />Signs/Pavement Markin <br />1 <br />LS <br />$ <br />2,654.40 <br />$ <br />2,654.40 <br />21 <br />Engin e rinDesign <br />1 <br />LS <br />$ <br />8,500.00 <br />$ <br />8,500.00 <br />22 <br />Permit A2plication Fees <br />1 <br />LS <br />$ <br />810.00--f--810.00 <br />23 <br />24 <br />Density Testin <br />SurveyStake-out <br />1LS <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />25 <br />SurveyAs-Built <br />1 <br />1 <br />LS <br />$ <br />1,800.00 <br />$ <br />1,800.00 <br />26 <br />Engineer Ins ections/Certs <br />1 <br />LS <br />LS <br />$ <br />$ <br />1,800.00 <br />3,360.00 <br />$ <br />$ <br />1,800.00 <br />3,360.00 <br />Total Construction: <br />$256 789.20 <br />PERFORMANCE BOND SURETY AMOUNT 115% OF TOTAL PROJECT $295,307.581 <br />CERTIFICATE OF COST ESTIMATE <br />I, John M. Boyer, a Florida Professional Engineer, License No. 57970, do hereby cern to India Incost estimate has been re are y fY n River Cbuthat this <br />prepared d under my responsible direction for those improvements itemized In this exhibit and that <br />the total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to <br />induce approval by the Co i& of a nal plat for the Millstone Landing Phases 4 - 6 project, and for the purpose of <br />establishing prope ociated therewith. <br />John M. Boy*,li, FL ; <br />Senior Project fthiineer <br />STATE OF <br />0, 40R%0t- <br />File#1017 tt <br />(16-0728 Millstone 23rd Street Perfornnance.)lsx) <br />1655 27th Street, Suite 2 <br />Vero Beach, Florida 32960 <br />(772) 567-5300 <br />Page 1 of 1 <br />145 <br />