Laserfiche WebLink
monitoring wells,the labor and materials will be invoiced under Task 4 of this Scope of Services. If <br /> the resampling is the result from errors made by the sampling staff,the COUNTY will not be <br /> invoiced.CONSULTANT/ITS will deliver the samples to the COUNTY contract laboratory(ENCO) <br /> Orlando office for analysis. <br /> Unless otherwise determined by the COUNTY, ENCO will perform the laboratory analysis under the <br /> COUNTY's contract. CONSULTANT will assist the COUNTY in coordinating the analytical testing <br /> activities with ENCO,notify FDEP prior to sampling as required by the MPIS, review and evaluate <br /> the analytical test results,and prepare the semi-annual reports. <br /> CONSULTANT will prepare a semi-annual report for each of the two monitoring events that will be <br /> submitted to FDEP within 60 days of receipt of valid laboratory results from the laboratory that is <br /> contracted by the COUNTY to analyze samples.Services included in preparing the semi-annual <br /> reports entail: <br /> ■ Review of laboratory results with respect to FDEP groundwater quality criteria and historical <br /> laboratory results. If review of the data indicates potential errors in the results or concentrations <br /> of analyses that could potentially result in enforcement action,CONSULTANT will notify the <br /> COUNTY prior to preparing the report and request confirmatory samples,if needed. <br /> ■ Preparation of semi-annual monitoring reports for the January and July monitoring events.The <br /> reports will include brief discussions of the results,water level contour maps,and copies of the <br /> analytical reports.A draft report will be submitted for review,if requested. <br /> ■ CONSULTANT will provide the final report in portable document file (PDF) format and analytical <br /> data in ADaPT format for submittal to FDEP in accordance with Paragraph V.7 of the WQMP. <br /> TASK 3.0—TITLE V PERMIT COMPLIANCE AND REPORTING <br /> Title V Permit No. 0610015-004-AV,which is the current permit as of the date of this work order, <br /> contains monitoring and reporting requirements related to the landfill gas collection and control <br /> system. CONSULTANT will assist COUNTY,as described below,in fulfilling all air permit <br /> requirements and conditions within the required regulatory timeframes. <br /> Statement of Compliance <br /> CONSULTANT will prepare and submit the annual Statement of Compliance for the COUNTY <br /> Landfill.This document must be submitted to FDEP within 60 days after the end of the calendar <br /> year,as required by Rule 62-213.440(3)(a)(2), F.A.C. <br /> Electronic Annual Operating Report(EAOR) <br /> CONSULTANT will prepare and submit the EAOR for the COUNTY Landfill.This report must be <br /> submitted to FDEP on or before April 1 of each calendar year,as required by Rule 62-210.370(3), <br /> F.A.C. <br /> CONSULTANT will estimate the annual emission rates of non-methane organic compounds and <br /> volatile organic compounds from the landfill gas to determine the COUNTY's status with regard to <br /> operation and reporting requirements of the active landfill gas collection and control system under <br /> the New Source Performance Standards requirements. <br /> A-3 111943WO7 doa <br />