Laserfiche WebLink
-22 <br /> STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION UTILo IES <br /> UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT OGc 1'14 <br /> (AT UTILITY EXPENSE) <br /> Financial Project ID: 430593-2-56-01 Federal Project ID: <br /> Financial Project ID: <br /> Financial Project ID: <br /> Financial Project ID: <br /> County: Indian River State Road No.: 656 <br /> District Document No: <br /> IL Utility Agency/Owner(UAO): Indian River County <br /> THIS AGREEMENT,entered into this day of year of by and between the STATE <br /> OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the "FDOT", and Indian River <br /> County, hereinafter referred to as the "UAO", <br /> WITNESSETH: <br /> WHEREAS, the FDOT, is constructing, reconstructing, or otherwise changing a portion of a public road or <br /> publicly owned rail corridor,said project being identified as 17 Street from US-1 to 17 St Causewy Bridge, State Road <br /> No • 656, hereinafter referred to as the "Project", and <br /> WHEREAS,the UAO owns or desires to install certain utility facilities which are located within the limits of the <br /> Project hereinafter referred to as the"Facilities"(said term shall be deemed to include utility facilities as the same may <br /> be relocated, adjusted, installed, or placed out of service pursuant to this Agreement); and <br /> WHEREAS,the Project requires the location(vertically and/or horizontally), protection, relocation, installation, <br /> adjustment or removal of the Facilities, or some combination thereof, hereinafter referred to as "Utility Work", and <br /> WHEREAS,the FDOT and the UAO desire to enter into a joint agreement pursuant to Section 337.403(1)(b), <br /> Florida Statutes for the Utility Work to be accomplished by the FDOT's contractor as part of the construction of the <br /> Project; and <br /> WHEREAS,the UAO, pursuant to the terms and conditions hereof,will bear certain costs associated with the <br /> Utility Work; <br /> NOW,THEREFORE, in consideration of the premises and the mutual covenants contained herein,the FDOT <br /> and the UAO hereby agree as follows. <br /> 1. Design of Utility Work <br /> a. UAO shall prepare, at UAO's sole cost and expense, a final engineering design, plans, technical <br /> special provisions, a cost estimate, and a contingency Utility Work Schedule (said contingency <br /> schedule to be used in the case of a bid rejection)for the Utility Work (hereinafter referred to as the <br /> "Plans Package")on or before Nov. 04, year of 2016 <br /> b The Plans Package shall be in the same format as the FDOT's contract documents for the Project <br /> and shall be suitable for reproduction <br /> C. Unless otherwise specifically directed in writing, the Plans Package shall include any and all activities <br /> and work effort required to perform the Utility Work, including but not limited to, all clearing and <br /> grubbing, survey work and shall include a traffic control plan <br /> d The Plans Package shall be prepared in compliance with the FDOT's Utility Accommodation Manual <br /> and the FDOT's Plans Preparation Manual in effect at the time the Plans Package is prepared, and <br /> the FDOT's contract documents for the Project. If the FDOT's Plans Preparation Manual has been <br /> updated and conflicts with the Utility Accommodation Manual,the Utility Accommodation Manual shall <br /> Page 1 of 9 <br />