|
710-010-22
<br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION UTIL TIES UTILES
<br />UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT OGc-11'14
<br />(AT UTILITY EXPENSE)
<br />Financial Project ID: 430593-2-56-01
<br />Federal Project ID:
<br />Financial Project ID:
<br />Financial Project ID:
<br />Financial Project ID:
<br />County: Indian River
<br />State Road No.: 656
<br />District Document No:
<br />Utility Agency/Owner (UAO): Indian River County
<br />THIS AGREEMENT, entered into this day of year of , by and between the STATE
<br />OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the "FDOT", and Indian River
<br />County, hereinafter referred to as the "UAO",
<br />WITNESSETH:
<br />WHEREAS, the FDOT, is constructing, reconstructing, or otherwise changing a portion of a public road or
<br />publicly owned rail corridor, said project being identified as 17 Street from US -1 to 17 St Causewy Bridge, State Road
<br />No • 656, hereinafter referred to as the "Project", and
<br />WHEREAS, the UAO owns or desires to install certain utility facilities which are located within the limits of the
<br />Project hereinafter referred to as the "Facilities" (said term shall be deemed to include utility facilities as the same may
<br />be relocated, adjusted, installed, or placed out of service pursuant to this Agreement); and
<br />WHEREAS, the Project requires the location (vertically and/or horizontally), protection, relocation, installation,
<br />adjustment or removal of the Facilities, or some combination thereof, hereinafter referred to as "Utility Work", and
<br />WHEREAS, the FDOT and the UAO desire to enter into a joint agreement pursuant to Section 337.403(1)(b),
<br />Florida Statutes for the Utility Work to be accomplished by the FDOT's contractor as part of the construction of the
<br />Project; and
<br />WHEREAS, the UAO, pursuant to the terms and conditions hereof, will bear certain costs associated with the
<br />Utility Work;
<br />NOW, THEREFORE, in consideration of the premises and the mutual covenants contained herein, the FDOT
<br />and the UAO hereby agree as follows.
<br />Design of Utility Work
<br />a. UAO shall prepare, at UAO's sole cost and expense, a final engineering design, plans, technical
<br />special provisions, a cost estimate, and a contingency Utility Work Schedule (said contingency
<br />schedule to be used in the case of a bid rejection) for the Utility Work (hereinafter referred to as the
<br />"Plans Package") on or before Nov. 04, year of 2016
<br />b The Plans Package shall be in the same format as the FDOT's contract documents for the Project
<br />and shall be suitable for reproduction
<br />C. Unless otherwise specifically directed in writing, the Plans Package shall include any and all activities
<br />and work effort required to perform the Utility Work, including but not limited to, all clearing and
<br />grubbing, survey work and shall include a traffic control plan
<br />d The Plans Package shall be prepared in compliance with the FDOT's Utility Accommodation Manual
<br />and the FDOT's Plans Preparation Manual in effect at the time the Plans Package is prepared, and
<br />the FDOT's contract documents for the Project. If the FDOT's Plans Preparation Manual has been
<br />updated and conflicts with the Utility Accommodation Manual, the Utility Accommodation Manual shall
<br />Page 1 of 9
<br />
|