Mr. Himanshu H. Mehta, P.E. <br />7 July 2014 <br />Page 2 <br />Site were identified by TCRPC for potential brownfields redevelopment to provide enhancement <br />to the surrounding Vero Beach community, and therefore; the preliminary assessment activities <br />were focused on this area. The preliminary assessment activities focused on: (i) identification of <br />contaminant concentrations in shallow soil above applicable regulatory criteria; (ii) presence of <br />landfill cover thickness of at least two feet (ft); and (iii) composition of soil gas in subsurface <br />soil, including the presence of methane, which is found in landfill gas (LFG) and can be <br />attributable to other sources as well. When this assessment was originally contemplated, IRC <br />planned to fund additional assessment activities based on the initial results to further the <br />evaluation of the Site for future redevelopment/reuse purposes. The additional assessment <br />activities, which are described herein, are designed with the same objectives as the preliminary <br />TCRPC-funded work and focused on the remaining 25 acres of IRC -owned portion of the <br />property (southwestern wooded area). <br />PROPOSED SCOPE OF WORK <br />The proposed scope of work consists of additional assessment activities to be performed within <br />the 25 acre assessment area on behalf of IRC SWDD at the Former South Gifford Road Landfill. <br />For the purpose of budgeting, the scope of work has been divided into the following tasks: <br />• Task 1 — Project Management; <br />• Task 2 — Meetings/Regulatory Negotiation <br />• Task 3 — Field Activities; and <br />• Task 4 — Data Evaluation and Reporting. <br />The remainder of this section presents a general description of the activities to be performed in <br />each task. <br />Task 1 — Project Management: Under this task, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice <br />review, project coordination, and project administration. <br />Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and <br />attend up to three meetings, with IRC SWDD, FDEP, local community organizations and/or the <br />IRC Board of County Commission (BOCC), as necessary. It is anticipated that one of these <br />meetings will include preparation for and attendance at a Gifford Progressive Civic League to <br />present an update on the redevelopment assessment activities and results conducted to date with <br />the TCRPC. The budget assumes that Nandra Weeks, PE (Geosyntec principal that has historical <br />knowledge of the assessment work completed to date at the Site and has been involved for some <br />time with IRC SWDD and the BOCC with exploring redevelopment options for the Site) and <br />Keith Tolson, PhD (Geosyntec toxicologist). Also, under this task, four hours has been included <br />for the project manager to provide ongoing support to IRC SWDD related to interaction and <br />negotiation with FDEP. <br />XR14096\XR14053-REV docx <br />engineers 1 scientists 1 innovators <br />