My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-104A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-104A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 1:20:08 PM
Creation date
1/5/2017 1:53:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/19/2014
Control Number
2014-104A
Agenda Item Number
8.Z.
Entity Name
Langham Consulting Services
Subject
Automatic Meter Reading
Advanced Metering Infrastructure
AMI Consulting Services Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.4.1 Develop a vendor selection process and scoring system that ensures the best possible solution is <br />selected for the County. Develop appropriate vendor evaluation criteria and coordinate the <br />overall selection process, including on-site vendor presentations. <br />11.4.2 Assist the County during the evaluation and vendor selection. <br />Task 5 — Contract Negotiations — estimated time to complete is 20 days <br />11.5 Assist the County during contract negotiations for AMR/AMI system installation and <br />implementation. <br />3. PHASE III <br />Task 6 — Strategy Formulation/Implementation Plans <br />111.6 Work with the AMR/AMI Project Team to develop an implementation plan and time line, <br />manage day-to-day processes, and involve other departments and organizations in the process and <br />work to ensure that major project milestones are met. This task shall also include route optimization as <br />needed, before any implementation. <br />Task 7 — Installation/System Activation <br />111.7 Provide ongoing planning, troubleshooting, and support to assist with day-to-day management <br />of the AMR/AMI implementation project. <br />111.7.1 Provide expert technical and business support for the changes required to the County's current <br />metering practices as the new AMR/AMI technologies are implemented. <br />Task 8 — Information Technology Interfaces <br />111.8 Evaluate, recommend, coordinate, and assist the County with IT interfaces required for <br />AMR/AMI implementation. <br />Phases I — III and Tasks 1— 8 above in general, outline the Consultant services anticipated by the County <br />such that the County can progress from initial feasibility analysis to final AMR/AMI technology <br />implementation. However, the County's evaluation of results achieved from each prior completed <br />Tasks/Phases will be the basis for direction to proceed to the subsequent phase; only if in the opinion of <br />the County it is determined to be in the County's continued best interests to pursue AMR/AMI <br />implementation, will the Consultant be directed to proceed to the next phase. <br />Page 8 of 9 <br />P.\B1ds\2013-2014 FY (2014000)\2014043 Utiht es RFP for AMR -AMI Meter Consulting Services\La ngham Agreement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.