My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-107
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 12:27:53 PM
Creation date
1/5/2017 2:08:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/19/2014
Control Number
2014-107
Agenda Item Number
8.J.J.
Entity Name
Florida Department of Transportation
Subject
Local Agency Agreement
Old Dixie Highway Sidewalk
Area
38th Lane to 45th St.
Project Number
0845B
Document Relationships
2014-067
(Attachment)
Path:
\Resolutions\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 <br />LOCAL AGENCY PROGRAM AGREEMENT PROJECT MANAGEMENT OFFICE <br />oaroe <br />Page 15 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 423186-2-58/68-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />Dated <br />PROJECT LOCATION: Old Dixie Highway <br />The project _ is ✓ is not on the National Highway System. <br />The project _ is ✓ is not on the State Highway System. <br />PROJECT DESCRIPTION <br />Old Dixie Highway from 381h Lane to 45'h Street. <br />SPECIAL CONSIDERATIONS BY AGENCY: <br />The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the <br />Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where <br />applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and <br />the funding action from any other source with respect to the project. <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A .(Phase 18 and 28 LAP Agreements) <br />b) Design to be completed by N/A .(Phase 38 LAP Agreements) <br />c) Right -of -Way requirements identified and provided to the Department by N/A (All LAPS requiring R/W) <br />(District will handle all Right of Way activities on LAPS, the date would be set by the necessary timeframe to <br />complete RAN activities. <br />d) Right -of -Way to be certified prior to advertising for Construction. (All Phase 58 LAPS) <br />e) Construction contract to be let by 3/31/15 . (For Phase 58 LAPS). (This date would be prior to the end of the <br />fiscal year that the Phase 58 is programmed in FM) <br />f) Construction to be completed by 12/31/16 . (Phase 58 LAP Agreements) <br />If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of federal funding. <br />This Project is for reimbursement of Construction and CEI only in the year 2014/2015 in the amount of $171,517.00. <br />Upon execution of this agreement by all parties the Department will provide the Agency ONE EXECUTED AGREEMENT <br />and a NOTICE TO PROCEED. The Agency should not start any construction prior to the EXECUTED AGREEMENT and <br />a NOTICE TO PROCEED. The Agency will only be reimbursed for costs incurred after the executed agreement date and <br />prior to the agreement or time extension (if required by a request for a time extension from the Agency) date and fiscal <br />year funding availability. <br />Upon completion of the Project, the Agency is required to notify the Department of the date of completion and final <br />invoicing. The Department may require an onsite inspection with the Agency. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.