My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-107
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 12:27:53 PM
Creation date
1/5/2017 2:08:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/19/2014
Control Number
2014-107
Agenda Item Number
8.J.J.
Entity Name
Florida Department of Transportation
Subject
Local Agency Agreement
Old Dixie Highway Sidewalk
Area
38th Lane to 45th St.
Project Number
0845B
Document Relationships
2014-067
(Attachment)
Path:
\Resolutions\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-00 <br />LOCAL AGENCY PROGRAM AGREEMENT PRODUCTION SUPPORT <br />oma„ <br />Page 16 <br />EXHIBIT "B" <br />SCHEDULE OF FUNDING <br />AGENCY NAME & BILLING ADDRESS FPN: 423186-2-58168-01 <br />Indian River County <br />180127 th Street. <br />Vero Beach, FL 32960 <br />PROJECT DESCRIPTION <br />Name: Old Dixie Highway Length: 0.855 Miles <br />Termini 1: from 38'" Lane to 45" Street Length: <br />TYPE OF WORK By Fiscal Year <br />FUNDING <br />(�) <br />TOTAL <br />PROJECT FUNDS <br />(2) <br />AGENCY <br />FUNDS <br />(3) <br />STATE & <br />FEDERAL FUNDS <br />Planning FY: NIA <br />Total Planning Cost <br />Project Development & Environment (PD&E) <br />FY: N/A <br />Total PO&E Cost <br />Design FY: N/A <br />Total Design Cost <br />Right -of -Way FY: N/A <br />Total Right -of -Way Cost <br />Construction FY: 2014-2015 SR2S <br />Total Construction Cost <br />$153.140.00 <br />$153.140.00 <br />$153,140.00 <br />$0.00 <br />$153,140.00 <br />Construction Engineering and Inspection (CEI) <br />FY: 2014-2015 SR2S <br />Total CEI Cost <br />Total Construction and CEI Costs <br />$18,377.00 <br />$0.00 <br />$18,377.00 <br />$18,377.00 <br />$0.00 <br />$18,377.00 <br />$171,517.00 <br />$0.00 <br />$171,517.00 <br />TOTAL COST OF THE PROJECT <br />$171,517.00 <br />$0.00 <br />$171,517.00 <br />The Department's fiscal year begins on July 1. For this project, funds are not projected to be available until after the 1 st of July of <br />each fiscal year. The Department will notify the Agency, in writing, when funds are available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.