Laserfiche WebLink
525-010-44 <br />PRODUCTION SUPPORT <br />11!13 <br />Page 2 of 6 <br />Requirement <br />Reference <br />Local Agency Responsibility <br />District Monitoring <br />Requirement Location <br />Responsibilities <br />4 Change Orders <br />23 CFR <br />Develop procedures outlining the conditions under which a <br />Review bid document for inclusion <br />Appendix B, Page 22, #22 <br />635 120 <br />change order is allowed and include in bid document. May use <br />of the provision. <br />Section 7 3 11 of FDOT CPAM as part of procedure <br />5 Claims <br />23 CFR <br />Develop procedures outlining the conditions under which a claim <br />Review bid document for inclusion <br />Appendix B, Page 23, #25 <br />635 124 <br />is allowed and include in bid document. May use Section 7.5 of <br />of the provision <br />FDOT CPAM as part of procedure <br />6 Contractor <br />23 CFR 140 <br />Do not allow <br />Review bid document to ensure <br />Appendix B, Page 24, #28 <br />Purchased Equipment <br />49 CFR Part <br />exclusion of provision <br />for State or Local <br />18 <br />Ownership <br />49 CFR <br />Section 18.3 <br />7 Suspension and <br />49 CFR 29 <br />The Local Agency shall include certification in bid documents <br />Review bid document for inclusion <br />Appendix B, Page 16,#15 <br />of provision. <br />�Debarment <br />8 Disadvantaged <br />49 CFR 26 <br />The Local Agency shall comply with FDOT's DBE Program Plan <br />Obtain copy of the USDOT <br />Appendix B, Page 20, #18 <br />Business Enterprise <br />unless the Local Agency has a DBE Program Plan approved by <br />approval letter for the DBE <br />(DBE) <br />the USDOT FDOT currently has a race neutral program with an <br />Program Plan for highways. <br />8 60% goal. <br />Establish a DBE availability goal and include in bid document. <br />Include DBE special provisions in bid document. <br />Use DBEs certified under the Florida Unified Certification <br />Program Directory- <br />http.//www bipincwebapps com/biznet/florida/ <br />9 On the Job Training <br />23 CFR 230 <br />Include FDOT's Standard Specification 7 -25 -OJT Training <br />Review bid document for inclusion <br />Not Applicable <br />Requirements in bid proposal and contract when project is on the <br />of the provision <br />t <br />SHS and or NHS OJT is not required for non SHS/non NHS <br />projects. <br />10 Equal Employment <br />23 CFR 230 <br />Include FDOT's Standard Specification 0073000 Legal <br />Review bid document for inclusion <br />Appendix B, Pages 2 & 3, #5 (2) <br />Opportunity <br />Requirements And Responsibility To The Public — Title VI <br />of this provision <br />Assurance — DOT 1050.2, Appendix A. <br />J; <br />11 Equipment Rental <br />23 CFR <br />Develop procedure based on 48 CFR 31 and include in bid <br />Review bid document for inclusion <br />Appendix B, Page 24, #28 <br />Rates <br />635 120 <br />document. <br />of the proper payment provision for <br />48 CFR 31 <br />rental equipment. <br />12 Foreign Contractor <br />49 CFR 30 <br />Proposal may not limit project to domestic -owned contractors <br />Review documents to ensure <br />Submission of bids is not limited <br />and Supplier <br />only <br />compliance <br />and/or restricted to domestic j <br />Restriction <br />owned contractors ! <br />