My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents, by a mutually agreed lump sum <br />(which may include an allowance for overhead <br />and profit not necessarily in accordance with <br />paragraph 12.01.C.2); or <br />3. where the Work involved is not cov- <br />ered by unit prices contained in the Contract <br />Documents and agreement to a lump sum is <br />not reached under paragraph 12.01.B.2, on the <br />basis of the Cost of the Work (determined as <br />provided in paragraph 11.01) plus a <br />CONTRACTOR's fee for overhead and profit <br />(determined as provided in paragraph 12.01.C). <br />C. CONTRACTOR's Fee: The <br />CONTRACTOR's fee for overhead and profit shall be <br />determined as follows: <br />1. a mutually acceptable fixed fee; or <br />2. if a fixed fee is not agreed upon, then <br />a fee based on the following percentages of the <br />various portions of the Cost of the Work: <br />a. for costs incurred under para- <br />graphs 11.01.A.1 and 11.01.A.2, the <br />CONTRACTOR's fee shall be 15 percent; <br />b. for costs incurred under paragraph <br />11.01.A.3, the CONTRACTOR's fee shall <br />be five percent; <br />c. where one or more tiers of subcon- <br />tracts are on the basis of Cost of the Work <br />plus a fee and no fixed fee is agreed upon, <br />the intent of paragraph 12.01.C.2.a is that <br />the Subcontractor who actually performs <br />the Work, at whatever tier, will be paid a fee <br />of 15 percent of the costs incurred by such <br />Subcontractor under paragraphs 11.01.A.1 <br />and 11.01.A.2 and that any higher tier <br />Subcontractor and CONTRACTOR will <br />each be paid a fee of five percent of the <br />amount paid to the next lower tier Subcon- <br />tractor; <br />d. no fee shall be payable on the <br />basis of costs itemized under paragraphs <br />11.01.A.4, 11.01.A.5, and 11.01.B; <br />e. the amount of credit to be allowed <br />by CONTRACTOR to OWNER for any <br />change which results in a net decrease in <br />cost will be the amount of the actual net <br />decrease in cost plus a deduction in <br />CONTRACTOR's fee by an amount equal <br />to five percent of such net decrease; and <br />f. when both additions and credits are <br />involved in any one change, the adjustment <br />in CONTRACTOR's fee shall be computed <br />on the basis of the net change in <br />accordance with paragraphs 12.01.C.2.a <br />through 12.01.C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A. The Contract Times (or Milestones) may only <br />be changed by a Change Order or by a Written <br />Amendment. Any Claim for an adjustment in the <br />Contract Times (or Milestones) shall be based on <br />written notice submitted by the party making the claim <br />to the ENGINEER and the other party to the Contract <br />in accordance with the provisions of paragraph 10.05. <br />B. Any adjustment of the Contract Times (or <br />Milestones) covered by a Change Order or of any <br />Claim for an adjustment in the Contract Times (or <br />Milestones) will be determined in accordance with the <br />provisions of this Article 12. <br />12.03 Delays Beyond CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of CONTRACTOR, the Contract Times (or <br />Milestones) will be extended in an amount equal to the <br />time lost due to such delay if a Claim is made therefor <br />as provided in paragraph 12.02.A. Delays beyond the <br />control of CONTRACTOR shall include, but not be <br />limited to, acts or neglect by OWNER, acts or neglect <br />of utility owners or other contractors performing other <br />work as contemplated by Article 7, fires, floods, <br />epidemics, abnormal weather conditions, or acts of <br />God. <br />12.04 Delays Within CONTRACTOR's Control <br />A. The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to and within the <br />control of a Subcontractor or Supplier shall be <br />deemed to be delays within the control of CONTRAC- <br />TOR. <br />12.05 Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or Milestones) in an amount <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 35 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \05308 13th Street SW at 58th Ave BridgeWdmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.