My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equal to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay. <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7. <br />B. Nothing in this paragraph 12.06 bars a <br />change in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />13.01 Notice of Defects <br />A. Prompt notice of all defective Work of which <br />OWNER or ENGINEER has actual knowledge will be <br />given to CONTRACTOR. All defective Work may be <br />rejected, corrected, or accepted as provided in this <br />Article 13. <br />13.02 Access to Work <br />A. OWNER, ENGINEER, ENGINEER's Con- <br />sultants, other representatives and personnel of <br />OWNER, independent testing laboratories, and <br />governmental agencies with jurisdictional interests will <br />have access to the Site and the Work at reasonable <br />times for their observation, inspecting, and testing <br />CONTRACTOR shall provide them proper and safe <br />conditions for such access and advise them of <br />CONTRACTOR's Site safety procedures and <br />programs so that they may comply therewith as <br />applicable. <br />13.03 Tests and Inspections <br />A. CONTRACTOR shall give ENGINEER timely <br />notice of readiness of the Work for all required <br />inspections, tests, or approvals and shall cooperate <br />with inspection and testing personnel to facilitate <br />required inspections or tests. <br />B. <br />• 1 . - <br />covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />tests Or ----inspections conducted pursuant to <br />3. as otherwise specifically provided in <br />C. If Laws or Regulations of any public body <br />having jurisdiction require any Work (or part thereof) <br />specifically to be inspected, tested, or approved by an <br />employee or other representative of such public body, <br />CONTRACTOR shall assume full responsibility for <br />arranging and obtaining such inspections, tests, or <br />approvals, pay all costs in connection therewith, and <br />furnish ENGINEER the required certificates of inspec- <br />tion or approval. <br />D. CONTRACTOR shall be responsible for <br />arranging and obtaining and shall pay all costs in <br />connection with any inspections, tests, or approvals <br />required for OWNER's and ENGINEER's acceptance <br />of materials or equipment to be incorporated in the <br />Work; or acceptance of materials, mix designs, or <br />equipment submitted for approval prior to <br />CONTRACTOR's purchase thereof for incorporation <br />in the Work. Such inspections, tests, or approvals <br />shall be performed by organizations acceptable to <br />OWNER and ENGINEER. <br />E. If any Work (or the work of others) that is to <br />be inspected, tested, or approved is covered by CON- <br />TRACTOR without written concurrence of ENGI- <br />NEER, it must, if requested by ENGINEER, be uncov- <br />ered for observation. <br />F. Uncovering Work as provided in paragraph <br />13.03.E shall be at CONTRACTOR's expense unless <br />CONTRACTOR has given ENGINEER timely notice <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 36 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\05308 13th Street SW at 58th Ave Bridge \\dmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.