My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with the requirements of paragraph <br />5.10 regarding property insurance. <br />14.06 Final Inspection <br />A. Upon written notice from CONTRACTOR that <br />the entire Work or an agreed portion thereof is <br />complete, ENGINEER will promptly make a final <br />inspection with OWNER and CONTRACTOR and will <br />notify CONTRACTOR in writing of all particulars in <br />which this inspection reveals that the Work is <br />incomplete or defective. CONTRACTOR shall <br />immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br />14.07 Final Payment <br />A. Application for Payment <br />1. After CONTRACTOR has, in the <br />opinion of ENGINEER, satisfactorily completed <br />all corrections identified during the final <br />inspection and has delivered, in accordance <br />with the Contract Documents, all maintenance <br />and operating instructions, schedules, guaran- <br />tees, Bonds, certificates or other evidence of <br />insurance certificates of inspection, marked -up <br />record documents (as provided in paragraph <br />6 12), and other documents, CONTRACTOR <br />may make application for final payment follow- <br />ing the procedure for progress payments. <br />2. The final Application for Payment <br />shall be accompanied (except as previously <br />delivered) by: (i) all documentation called for in <br />the Contract Documents, including but not <br />limited to the evidence of insurance required by <br />subparagraph 5.04.6.7; (ii) consent of the <br />surety, if any, to final payment; and (iii) <br />complete and legally effective releases or <br />waivers (satisfactory to OWNER) of all Lien <br />rights arising out of or Liens filed in connection <br />with the Work. <br />3. In lieu of the releases or waivers of <br />Liens specified in paragraph 14.07.A.2 and as <br />approved by OWNER, CONTRACTOR may <br />furnish receipts or releases in full and an <br />affidavit of CONTRACTOR that: (i) the releases <br />and receipts include all labor, services, <br />material, and equipment for which a Lien could <br />be filed; and (ii) all payrolls, material and <br />equipment bills, and other indebtedness <br />connected with the Work for which OWNER or <br />OWNER's property might in any way be <br />responsible have been paid or otherwise satis- <br />fied. If any Subcontractor or Supplier fails to <br />furnish such a release or receipt in full, CON- <br />TRACTOR may furnish a Bond or other <br />collateral satisfactory to OWNER to indemnify <br />OWNER against any Lien. <br />B. Review of Application and Acceptance <br />1. If, on the basis of ENGINEER's <br />observation of the Work during construction <br />and final inspection, and ENGINEER's review <br />of the final Application for Payment and <br />accompanying documentation as required by <br />the Contract Documents, ENGINEER is <br />satisfied that the Work has been completed <br />and CONTRACTOR's other obligations under <br />the Contract Documents have been fulfilled, <br />ENGINEER will, within ten days after receipt of <br />the final Application for Payment, indicate in <br />writing ENGINEER's recommendation of <br />payment and present the Application for <br />Payment to OWNER for payment. At the same <br />time ENGINEER will also give written notice to <br />OWNER and CONTRACTOR that the Work is <br />acceptable subject to the provisions of <br />paragraph 14.09. Otherwise, ENGINEER will <br />return the Application for Payment to <br />CONTRACTOR, indicating in writing the <br />reasons for refusing to recommend final <br />payment, in which case CONTRACTOR shall <br />make the necessary corrections and resubmit <br />the Application for Payment. <br />C. Payment Becomes Due <br />1. Thirty days after the presentation to <br />OWNER of the Application for Payment and <br />accompanying documentation, the amount <br />and, when due, will be paid by OWNER to <br />CONTRACTOR. <br />14.08 Final Completion Delayed <br />A. If, through no fault of CONTRACTOR, final <br />completion of the Work is significantly delayed, and if <br />ENGINEER so confirms, OWNER shall, upon receipt <br />of CONTRACTOR's final Application for Payment and <br />recommendation of ENGINEER, and without terminat- <br />ing the Agreement, make payment of the balance due <br />for that portion of the Work fully completed and <br />accepted. If the remaining balance to be held by <br />OWNER for Work not fully completed or corrected is <br />less than the retainage stipulated in the Agreement, <br />and if Bonds have been furnished as required in <br />paragraph 5.01, the written consent of the surety to <br />the payment of the balance due for that portion of the <br />Work fully completed and accepted shall be submitted <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 42 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS\05308 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents100700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.