My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by CONTRACTOR to ENGINEER with the Application <br />for such payment. Such payment shall be made <br />under the terms and conditions governing final <br />payment, except that it shall not constitute a waiver of <br />Claims. <br />14.09 Waiver of Claims <br />A. The making and acceptance of final payment <br />will constitute: <br />1. a waiver of all Claims by OWNER <br />against CONTRACTOR, except Claims arising <br />from unsettled Liens, from defective Work <br />appearing after final inspection pursuant to <br />paragraph 14.06, from failure to comply with the <br />Contract Documents or the terms of any special <br />guarantees specified therein, or from <br />CONTRACTOR's continuing obligations under <br />the Contract Documents; and <br />2. a waiver of all Claims by CONTRAC- <br />TOR against OWNER other than those <br />previously made in writing which are still <br />unsettled. <br />ARTICLE 15 - SUSPENSION OF WORK AND <br />TERMINATION <br />15 01 OWNER May Suspend Work <br />A. At any time and without cause, OWNER may <br />suspend the Work or any portion thereof for a period <br />of not more than 90 consecutive days by notice in <br />writing to CONTRACTOR and ENGINEER which will <br />fix the date on which Work will be resumed. CON- <br />TRACTOR shall resume the Work on the date so <br />fixed. <br />in the Contract Price or an extension of the Contract <br />Times, or both, directly attributable to any such <br />_e, • - <br />15.02 OWNER May Terminate for Cause <br />A. The occurrence of any one or more of the <br />following events will justify termination for cause: <br />1. CONTRACTOR's persistent failure <br />to perform the Work in accordance with the <br />Contract Documents (including, but not limited <br />to, failure to supply sufficient skilled workers or <br />suitable materials or equipment or failure to <br />adhere to the progress schedule established <br />under paragraph 2.07 as adjusted from time to <br />time pursuant to paragraph 6.04); <br />2. CONTRACTOR's disregard of Laws <br />or Regulations of any public body having <br />jurisdiction; <br />3. CONTRACTOR's disregard of the <br />authority of ENGINEER; or <br />4. CONTRACTOR's violation in any <br />substantial way of any provisions of the <br />Contract Documents. <br />B. If one or more of the events identified in <br />paragraph 15.02.A occur, OWNER may, after giving <br />CONTRACTOR (and the surety, if any) seven days <br />written notice, terminate the services of <br />CONTRACTOR, exclude CONTRACTOR from the <br />Site, and take possession of the Work and of all <br />CONTRACTOR's tools, appliances, construction <br />equipment, and machinery at the Site, and use the <br />same to the full extent they could be used by <br />CONTRACTOR (without liability to CONTRACTOR for <br />trespass or conversion), incorporate in the Work all <br />materials and equipment stored at the Site or for <br />which OWNER has paid CONTRACTOR but which <br />are stored elsewhere, and finish the Work as OWNER <br />may deem expedient. In such case, CONTRACTOR <br />shall not be entitled to receive any further payment <br />until the Work is finished. If the unpaid balance of the <br />Contract Price exceeds all claims, costs, losses, and <br />damages (including but not limited to all fees and <br />charges of engineers, architects, attorneys, and other <br />professionals and all court or arbitration or other <br />dispute resolution costs) sustained by OWNER arising <br />out of or relating to completing the Work, such excess <br />will be paid to CONTRACTOR. If such claims, costs, <br />losses, and damages exceed such unpaid balance, <br />CONTRACTOR shall pay the difference to OWNER. <br />Such claims, costs, losses, and damages incurred by <br />OWNER will be reviewed by ENGINEER as to their <br />reasonableness and, when so approved by <br />ENGINEER, incorporated in a Change Order. When <br />exercising any rights or remedies under this <br />paragraph OWNER shall not be required to obtain the <br />lowest price for the Work performed. <br />C. Where CONTRACTOR's services have been <br />so terminated by OWNER, the termination will not <br />affect any rights or remedies of OWNER against <br />CONTRACTOR then existing or which may thereafter <br />accrue. Any retention or payment of moneys due <br />CONTRACTOR by OWNER will not release CON- <br />TRACTOR from liability. <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 43 <br />F \Public Works\ENGINEERING DIVISION PROJECTS10530B 13th Street SW at 58th Ave BridgeWdmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.