My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.B shall be paid as provided in said paragraph 13.04.B; <br />3. tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its <br />place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with permit <br />requirements, or fails to comply with the technical specifications, or fails to <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br />employee or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07 A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the <br />following sentence in its place <br />A. If within one year after the date of Final Completion or such longer period of time <br />as may be prescribed by Laws or Regulations or by the terms of any applicable <br />special guarantee required by the Contract Documents or by any specific provision <br />of the Contract Documents, any Work is found to be defective, or if the repair of <br />any damages to the land or areas made available for CONTRACTOR's use by <br />OWNER or permitted by Laws and Regulations as contemplated in paragraph <br />6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br />OWNER and in accordance with OWNER's written instructions: (i) repair such <br />defective land or areas, or (ii) correct such defective Work or, if the defective Work <br />has been rejected by OWNER, remove it from the Project and replace it with Work <br />that is not defective, and (iii) satisfactorily correct or repair or remove and replace <br />any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its <br />place <br />B. In special circumstances where a particular item of equipment is placed in continu- <br />ous service before Final Completion of all the Work, the correction period for that <br />item may start to run from an earlier date if so provided in the Specifications or by <br />Written Amendment. <br />00800-8 <br />00800 - Supplementary Conditions 05-13 rev.doc <br />00800 8F \Public Works\ENGINEERING DIVISION PROJECTS\05308 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.