My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -14.02 Progress Payments <br />SC -14.02.B.5. Delete paragraph GC -14.02.8.5.d in its entirety and insert the following paragraph <br />in its place: <br />d. ENGINEER has actual knowledge of the occurrence of any of the events <br />enumerated in paragraph 15.02.A; or <br />SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.8.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because <br />of CONTRACTOR delays or rejection of defective Work; or <br />f. OWNER has been required to pay an independent testing laboratory for <br />subsequent inspections, tests, or approvals taken after initial failing <br />inspections, tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the Local <br />Government Prompt Payment Act. F.S. 218.70 et. seq. <br />SC -14.04 Substantial Completion <br />SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, <br />delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br />"If Engineer considers the Work substantially complete, Engineer will prepare <br />and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br />the date of Substantial Completion. In accordance with the provisions of Florida <br />Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of <br />Substantial Completion from Engineer, the Owner, the Engineer, and the <br />Contractor shall conduct a walk-through inspection of the Project to document a <br />list of any items required to render the Work on the Project complete, <br />satisfactory, and acceptable under this Agreement (herein the "Statutory List"). <br />The Statutory List shall be reduced to writing and circulated among the Owner, <br />the Engineer, and the Contractor by the Owner or the Engineer within 30 <br />calendar days after substantial completion. The Owner and Contractor <br />acknowledge and agree that: 1) the failure to include any corrective work, or <br />pending items that are not yet completed, on the Statutory List does not alter the <br />responsibility of the Contractor to complete all of the Work under this Agreement; <br />2) upon completion of all items on the Statutory List, the Contractor may submit a <br />pay request for all remaining retainage except as otherwise set forth in this <br />Agreement; and 3) any and all items that require correction under this Agreement <br />and that are identified after the preparation of the Statutory List remain the <br />obligation of the Contractor to complete to the Owner's satisfaction under this <br />Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on <br />the Statutory List and schedule a final walk-through in anticipation of final <br />completion on the Project." <br />00800-9 <br />00800 - Supplementary Conditions 05-13 rev.doc <br />00800 9F \Public Works\ENGINEERING DIVISION PROJECTS \05308 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />