Laserfiche WebLink
UTILITIES: <br />1. Power Lines — overhead power lines will be relocated by FP&L (utilizing a temporary shoe -fly) <br />for the bridge construction. <br />1. IRC Utilities has no utilities at the bridge crossing. <br />2. AT&T, Comcast Cable Communications, Florida City Gas and any other utility will need to have <br />locates prior to construction. <br />Discussion: <br />1. The contractors requested if Jetting to install the piles and sheet pile would be allowed. <br />Clarification will be discussed in an addendum. <br />ATTACHED: <br />Sign in sheet <br />F \Public Wachs +ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge \Admin\MeetingsTre-Bid\Pre-bid meeting minutes for 8-6-14.doc <br />