Laserfiche WebLink
131" Street SW Bridge at 58"' Avenue <br />File No. 07-5535 <br />Table 1: Abutment Pile Capacities <br />-S» <br />u4, '�i.'S Kw ir. 3�+ <br />4� iie`rWtdth <br />t:, „i''pa;' .;s, <br />���pnches]�^-'�,'•r:° 7� <br />�,�.,'�iirir':. �:�;"<:)°�4�' "T'� 43'� }=a <br />_ 4I en th, <br />t:r-a r'a.;7?q i- y <br />��',���.,[feetJ��:�����. � <br />:y+:4 r.�•�:J. <br />�i, :a.�'ru�i�.o-�,.�. .M hl"':1�v. <br />Compression. Capaci <br />�^ro''%• ,tt,�4 ;. :.i�d%'"-.�'�,.y <br />� i��,.� tans �,,:a�r,,. <br />�,i�.,�•G� �iN ]3•��"u".. � <br />;�,f. J�QYYN,�n4'.a.'w "Y.11,'•�y'�}�-, r _ <br />' a <br />t z �. �'°?''4 ,:".i�'y:' <br />�,;����':r'��4[tons]��, �;-LL, <br />j`r e+vY�k � ���A4 J" <br />e1u7<;°9»4u'�I�l�4.�'I�wI�.,EF,� <br />14 <br />40 <br />40 <br />20 <br />14 <br />45 <br />45 <br />25 <br />18 <br />40 <br />55 <br />25 <br />18 <br />45 <br />65 <br />40 <br />The above capacities include a factor of safety of 2, (i.e., the allowable compression capacities are <br />half of the calculated Davisson capacities and the allowable tension (uplift) capacities are half of <br />the calculated ultimate side friction). <br />We recommend using published values for p -y multipliers (i.e., reduction factors) for the analyses <br />of lateral capacity of pile groups. We recommend a minimum spacing of 5 feet (center -to -center) <br />to provide a reasonable remnant of lateral pile capacity, and to promote the independent behavior <br />of the individual piles in axial capacity. <br />The lateral capacity of the piles will depend on the permitted lateral movement of the piles, the <br />framing/bracing influence of the bridge superstructure, and the unsupported length of the pile. The <br />piles can likely be considered to be fixed -head piles and restrained from rotation by the pile caps. <br />Maximum bending moments and the location of the point of fixity will depend on the thicknesses <br />of the pile caps, the reinforcing of the piles, etc. The Bridge Engineer should size the pile caps and <br />reinforce the piles and pile caps so as to withstand all axial, bending, tensile, and shear stresses. <br />Pile Installation <br />Prestressed concrete piles should be driven with a variable energy hammer capable of delivering <br />the energy specified in Florida Department of Transportation, Standard Specifications for Road and <br />Bridge Construction, Section 455. Due to variable soil conditions, it may be necessary to vary the <br />hammer energy during driving. Pile driving should be as continuous an operation as possible and <br />should proceed without stopping over the last 10 feet of penetration. <br />During driving, pile driving records should be kept for each pile detailing pertinent information such <br />as the pile type, pile length, date driven, and blow count per foot. The capacity of each pile should <br />be reviewed based on its final tip elevation and driving record. We recommend that pile driving <br />operations be continuously monitored by an Ardaman representative. <br />We recommend using a Pile Driving Analyzer (PDA) on at least one test pile to verify the capacities <br />of these piles. Pending the results of the PDA, the test pile can be used as a production pile. Care <br />should be exercised when selecting the hammer type and energy rating so as to avoid damaging <br />the piles during the installation process. <br />