Laserfiche WebLink
ADDENDUM NO. 1 JULY 31, 2014 <br />SECTION 1- Technical Specifications <br />STANDARD SPECIFICATIONS <br />A. All work of this Contract shall conform to the applicable technical specifications of <br />Florida Department of Transportation Standard Specifications for Road and Bridge <br />Construction, 2010, and Supplemental Specification, Special Provisions and <br />addenda thereto, except as modified and supplemented hereinafter. Reference to <br />Article numbers herein -after apply to the FDOT Standard Specifications, and <br />reference in FDOT Standard Specifications to Department shall be taken as the <br />Owner or its appointed Representative. Wherever the Specifications, <br />Supplementals, etc. may refer to the "Owner", "Department", "State of Florida <br />Department of Transportation", or words relating to offices of State Government, <br />such words shall be taken as meaning Owner or Indian River County, Florida. <br />Wherever the word "Owner's Engineer", "District Engineer", "Engineer", "Project <br />Engineer", etc., appears, it shall be taken to mean the Registered Professional <br />Project Engineer of the Indian River County Public Works Department, Engineering <br />Division acting directly or through duly authorized representatives. Wherever the <br />word "Resident Engineer" appears, it shall be taken to mean an authorized <br />representative of the Owner's Engineer on the Project (Resident Construction <br />Inspector) who will act as an agent for Indian River County, assigned to observe <br />the progress quantity and quality of the work. <br />The work to be performed per line items 700 through 711 shall conform to the <br />applicable standards of Indian River County Typical Drawings for Pavement <br />Markings, Signing & Geometrics Dated July, 2011. <br />SECTION 4- SCOPE OF WORK <br />Section 4-3.9 Value Engineering Incentive is deleted in its entirety. <br />SECTION 101 - MOBILIZATION <br />The work specified in this section shall conform to Section 101 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. (2010 Edition) <br />PART 1 - GENERAL <br />1.01 The work specified in this section shall include: <br />A. Record/As-Built Drawings shall be done and conform to Section 108 of the <br />Technical Specifications and included in Mobilization. <br />B. Field engineering and layout shall be in conformance to Section 01050, Field <br />Engineering and Layout of Division 1, General Requirements. <br />01025-1 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1137-0Id Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St'Admim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />