My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. REVISIONS, ADDENDUM NO. 1 <br />Old Dixie Highway between IRFWCD North Relief Canal and 71st Street <br />Phase 1 = Old Dixie Hwy between North Relief Canal and 69th Street <br />Phase 2 = Old Dixie Hwy between 69th Street and 71st Street <br />All projects and work within Indian River County right-of-way shall have an approved <br />Traffic Control Plan (TCP). All work shall be executed under the established TCP and <br />Indian River County approved procedures. The TCP shall provide the proposed detour <br />route, traffic control devices, and other pertinent information for the proposed Old <br />Dixie Highway Resurfacing Project and shall be submitted for review and approval by <br />the Public Works Department. <br />The FDOT Design Standards, Indices 600, 2010 do not include a Traffic Control Plan for <br />a full road closure. For full road closures, a TCP is required to be submitted by the <br />contractor a minimum of two (2) weeks prior to the proposed road closure. <br />All traffic control devices shall be in accordance with the Florida Department of <br />Transportation (FDOT) Design Standards, Indices 600, 2010, the Manual on Uniform <br />Traffic Control Devices, 2009 Edition, and Indian River County Typical Drawings for <br />Signing, Pavement Markings, and Geometrics, latest edition. <br />Indian River County will not allow the closure of Old Dixie Highway without an <br />approved Traffic Control Plan. <br />Detour routes will be established via 53rd Street, 69th Street, County Road 510, and US <br />Highway 1. <br />Please place the following regulations on the TCP: <br />1. All signs to be ground mounted and have lights and flags. <br />2. No open excavations after dark. <br />3. All barricades to have lights. <br />4. Place a note on the TCP to state: All work shall comply with the 2014 FDOT's <br />Design Standards, Indices 600, the Manual on Uniform Traffic Control <br />Devices, and in accordance with Indian River County requirements. <br />5. Access to property owners as well as emergency access will be maintained at <br />all times. <br />6. Local Traffic Only signs as well as twenty (20) specialty signs stating; "Old Dixie <br />Closed at XXSt" and/or a similar message will be required along side <br />streets and at major intersections. <br />7. Four (4) Variable Message Signs are required to pre -advertise the roadway <br />closure, a minimum of seven (7) days in advance of the road closure and <br />01025-13 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.