My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
during the duration of the road closure. Messages are to be as approved by <br />the Public Works Department and shown on the TCP. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 102-1 - Maintenance of Traffic - Lump Sum <br />SECTION 104 EROSION CONTROL AND TREATMENT OF DEWATERING WATER <br />AND STORMWATER FROM THE CONSTRUCTION SITE <br />PART 1 — GENERAL <br />1.1 SCOPE <br />A. This Section covers erosion control and the treatment of dewatering water and stormwater <br />runoff from the construction site and work area. The pollution control measures shall <br />prevent turbid or otherwise polluted waters from being discharged from the construction <br />site or work area, to undeveloped portions of the site or off-site. <br />B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br />construction site or work area to be a very serious offense. The CONTRACTOR is <br />solely responsible for preventing pollution caused by dewatering water and stormwater <br />runoff from the construction site or work area. <br />C. The pollution control measures specified herein represent minimum standards to be <br />adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br />reserves the right to require the CONTRACTOR to employ additional pollution control <br />measures, when in the sole opinion of the OWNER, they are warranted. If site specific <br />conditions require additional erosion and stormwater pollution control measures during any <br />phase of construction or operation to prevent erosion or to control sediment or other <br />pollution, beyond those specified in the Drawings or herein, implement additional best <br />management practices as necessary, in accordance with Chapter 4, "Best Management <br />Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment <br />Control Inspector's Manual, and other references as may be required by regulatory <br />permits. (http://www.dep.state.fl.us./water/nonpoint/docs/erosion/erosion-inspectors- <br />manual.pdf) <br />D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br />Section. Alternatively, the OWNER may halt the CONTRACTOR's operations until the <br />CONTRACTOR is in full compliance with this Section. If the OWNER halts the <br />CONTRACTOR's work as a result of its failure to comply with this Section, the Construction <br />01025-14 Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\1137-0Id Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />StWdmim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.