My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Subsoil Excavation - Any excavation below the proposed bottom elevation of the select <br />fill, isolated swale bottom locations, isolated locations for pipe installations and as <br />approved by the engineer shall be paid for as subsoil excavation. Approximately 2.0 ft <br />of subsoil excavation is required in sublateral canals. Cost of replacement <br />embankment shall be included in cost of subsoil excavation. Contractor to coordinate <br />with county representative prior to any subsoil excavation. <br />E. Embankment - General Requirements for Embankment Materials: The following is <br />added after the first paragraph of Subarticle 120-7.2: <br />Roadway Design Standard Index No. 505, Embankment Utilization Details is modified <br />by the addition of the following: <br />Any stratum or stockpile or soil which contains obvious pockets of highly organic <br />material may be designated as muck or unsuitable for construction of subgrade by the <br />Owner. <br />Backfill material containing more than 2.0% by weight of organic material, as <br />determined by FM 1-T 267 and by averaging the test results for three randomly <br />selected samples from each stratum or stockpile of a particular material, shall not be <br />used in construction of the reinforced volume. If an individual test value of the three <br />samples exceeds 3.0%, the stratum or stockpile will not be suitable for construction of <br />the reinforced volume. <br />No A-8 material permitted in embankment. <br />F. Payment shall be made under: <br />Bid Item No. 120-1 Grading, Excavation and Embankment - Per Square Yard <br />SECTION — 120-2 BORROW EXCAVATION (ASPHALT MILLINGS) <br />Description — borrow Excavation consists of the excavation and utilization of material from <br />authorized borrow pits, including only material that is suitable for the construction of <br />roadway embankments or of other embankments covered by the contract. Borrow material <br />used in this project is to consist of asphalt millings. <br />Bid Item No. 120-2 Borrow Excavation (millings) — Per Cubic Yard <br />SECTION -160 STABILIZATION <br />A. Sub Article 160-5.1 is modified by the addition of the following: <br />"The stabilization thickness indicated on plans shall be considered a minimum <br />thickness. Thickness will vary to conform to the lines, and grades shown in the plans." <br />Minimum L.B.R. = 40 - No under -tolerance. <br />01025-26 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-0Id Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.