Laserfiche WebLink
4. Access to all businesses, residences, the North County Charter School and emergency Vehicles shall <br />be maintained at all times. <br />5. No traffic will be allowed on the new roadway between the time when the asphalt emulsion is <br />injected into the base material and the time when the first lift of asphalt is put down with the <br />exception of the local traffic for the businesses, residences and the North County Charter School. <br />6. Through traffic for 65th Street and 69th Street shall be maintained at all times. <br />7. Individual Business Name Service Signs for all businesses and schools will be required per the Manual <br />of Uniform Traffic Control Devices 2009 Edition. <br />8. The Maintenance of Traffic Plan shall meet the FDOT Index 600 series, 2014 edition. <br />UTILITIES: <br />IRC Utilities - The Contractors were informed that water valves and air relief boxes would have to be <br />adjusted and there were some fire hydrants to be relocated. The contractors were concerned about the <br />depth of the Force main which will be under the pavement. <br />Florida Power and Light Co. — Dennis Pagano indicated that he did not feel there would be any conflicts. <br />Florida City Gas - Bock Kreinhagen said that Florida City Gas had a gas line in the area. It should have 48" <br />of cover. Call for locates. <br />AT&T — Was not present <br />Comcast Cable Communications - Was not present <br />FULL DEPTH RECLAMATION: <br />Dunkelberger Engineering and Testing, Inc. — David Youngstrom described the base reclamation process. <br />Testing: <br />Test prior to injection of emulsion <br />Consistent gradation prior to inject of emulsion <br />After injection — test of in-place material for maximum density of reclaimed base. <br />Reclaimed base to have structural number coefficient (2.0 desirable, 1.8 minimum accepted) <br />Contractor pays for design testing for mixing and structural number coefficient <br />IRC is responsible for testing cost of compaction and density testing costs and verification of <br />Contractor testing results. <br />Discussion: <br />Indian River County will hire geotechnical firm to perform testing and verify the contractor's base design. <br />The County will send out an addendum addressing the phasing of the work, Maintenance of Traffic and <br />detouring. <br />ATTACHED: <br />Sign in Sheet <br />F \Public Works\ENGINEERING DIVISION PROJECTS \I 137-01d Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Admim\Nleetings`•Pre-bid meeting minutes for 7-24- <br />14.doc <br />