piping during the test periods or as approved by the Engineer. Allowable <br />leakage shall be computed on the basis of AWWA C-600. <br />2. All leaks evident at the surface shall be uncovered and repaired <br />regardless of the total leakage as indicated by the test, and all pipes, <br />valves and fittings and other materials found defective under the test <br />shall be removed and replaced at the Contractor's expense. Tests shall <br />be repeated until leakage has been reduced below the allowable <br />amount. <br />3. In the judgment of the Engineer, should it not be practical to follow the <br />foregoing procedures exactly for any reason, modifications in the <br />procedure shall be made as approved by the Engineer. In any event, the <br />Contractor shall be responsible for the ultimate water tightness of the <br />piping within the preceding requirements. <br />3.03 DISINFECTION <br />A. The Contractor shall furnish and install suitable temporary connections to the <br />piping, all necessary pressure pumps, hose, pipe connections, meters, gauges <br />and other similar equipment, and all labor required, all without additional <br />compensation for the disinfection of all required piping systems. Disinfection <br />shall be conducted on the following systems: <br />1. Water main piping and valves. <br />B. Conform to AWWA Standards and as modified herein. <br />C. Maintain disinfectant for a minimum of 8 hours in such a manner that the entire <br />system will be filled with water containing a minimum chlorine concentration of <br />50 ppm at any point. <br />D. After the disinfecting agents have been permitted to remain for the specified <br />contact periods, the water lines, and valves shall be thoroughly flushed with <br />water until the residual chlorine tests are less than 2 PPM in each instance. <br />The determination of the amount of residual chlorine in the system shall be <br />made at such points and in accord with standard tests by means of a standard <br />orthotolodine test set. <br />3.04 BACTERIOLOGICAL SAMPLING <br />A. It shall be the responsibility of the Contractor under this contract to perform the <br />bacteriological testing required by the Florida Department of Environmental <br />Protection and Indian River County to obtain clearance of the water main <br />piping. The Contractor shall be responsible to disinfect and repeat testing as <br />needed until clearance is obtained for all required plant systems. The <br />Contractor shall be responsible to pay for additional water needed if the <br />bacteriological testing must be repeated for the clearance of the ground storage <br />tank. <br />B. The piping systems require two (2) consecutive daily samples taken from the <br />locations called out on the plans or as determined by the Engineer. The <br />01025-40 <br />Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS \1137-01d Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 2 08-01-2014.doc <br />