Laserfiche WebLink
samples shall be taken at all the respective sample point locations. <br />C. Sampling must be coordinated with Engineer and other construction activities so <br />as to minimize re -sampling. <br />D. Contractor shall submit schedule for bacteriological testing and pressure tests. <br />E. The Contractor shall incur all costs needed to provide bacteriological clearance of <br />the piping systems. <br />3.11 QUALITY CONTROL <br />A. The laboratory and personnel collecting bacteriological samples shall be Florida <br />State certified in accordance with FDEP requirements. <br />Item of Payment <br />Payment shall be made under: <br />Bid Item 166-4800 — Relocate Existing Fire Hydrant — Per Each <br />+ + END OF SECTION + + <br />01025-41 <br />Technical Specifications <br />F\Public Works\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 2 08-01-2014.doc <br />