My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-003
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 4:52:15 PM
Creation date
1/10/2017 4:52:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/10/2017
Control Number
2017-003
Agenda Item Number
8.K.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South Oslo Rd. Water Plant Floridan Well S-4 Replacement
Work Order No. 11
Area
Oslo Road water treatment plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
setbacks from existing utilities and facilities;and review the sites and adjacent areas <br /> for items which may affect permitting of a new well site. <br /> Consultant will prepare design drawings for a new wellhead, similar in design and <br /> configuration to the existing wellhead. It is assumed that the pump will be vertical <br /> turbine type using flanged or threaded column pipe. The design documents will <br /> consist of civil, mechanical, and electrical drawings that will include connection to <br /> the existing 12-inch raw watermain, use of the existing electrical service, and a new <br /> fiber optic connection to allow direct communication of well with the water plant. <br /> it is assumed the radio telemetry will be eliminated as part of this replacement. <br /> It is assumed that approximately 10 - 12 drawings will be prepared, consisting of; <br /> • Cover sheet <br /> • Overall site plan <br /> • Civil details <br /> • Wellsite plan& details <br /> • Wellhead sections <br /> • Mechanical details <br /> • Electrical (single line, panel drawings, fiber optic) <br /> The consultant will prepare technical specifications for construction and drilling of <br /> a new supply well. <br /> Consultant will prepare a 90% set of drawings and specifications for IRCU to <br /> review, and incorporate comments into the final set of drawings and specifications <br /> to be used for a change order request from the current contractor, and submission <br /> to FDEP for permitting. <br /> Consultant will design modifications to the existing radio telemetry unit (RTU) at <br /> well S-4 to include fiber optic connectivity using Ethernet communication. Remote <br /> PLC's will be designed at the well to allow communication via Ethernet over FO. <br /> Consultant will design well panel PLC hardware at the well #S-4 and interface with <br /> existing system. <br /> TASK 2 - PERMITTING <br /> Consultant will evaluate the need for permitting a replacement well, including <br /> preparation of a letter modification to SJRWMD Permit and an updated location map <br /> and Table A (description of wells). No changes to existing permit allocation shall be <br /> requested in the letter modification. <br /> K:\WPB_Civil\044572029-Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.