My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-003
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 4:52:15 PM
Creation date
1/10/2017 4:52:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/10/2017
Control Number
2017-003
Agenda Item Number
8.K.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South Oslo Rd. Water Plant Floridan Well S-4 Replacement
Work Order No. 11
Area
Oslo Road water treatment plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant shall have no responsibility for any contractor's means, methods, <br /> techniques, equipment choice and usage, sequence, schedule, safety programs, or <br /> safety practices, nor shall the Consultant have any authority or responsibility to <br /> stop or direct the work of any contractor. <br /> Consultant will provide construction phase services including hydrogeological <br /> services, performance testing of each well, and preparation of a well completion <br /> report for well #S-4 Floridan Aquifer well. Consultant will utilize subconsultant <br /> services of JLA Geosciences, Inc. for the Hydrogeologic Consulting Services (JLA). <br /> Consultant will provide hydrogeological support and observation services during <br /> Upper Floridan Aquifer well #S-4 construction including surface casing installation, <br /> pilot hole drilling, geophysical logging,casing installation, grouting casing in place <br /> for each lift of cement, completion interval drilling and associated testing, <br /> preliminary well development, acid treatment, pump development and testing. <br /> Consultant will also provide well performance testing, including water level <br /> measurements, specific capacity analysis, and basic water quality testing <br /> (conductivity,chlorides, silt density indices-'SDI's and sand testing). Consultant <br /> will provide up to 220 hours of on-site hydrogeological services (JLA) for well #S-4. <br /> Consultant will review drilling, geologic and geophysical data and provide <br /> recommendations for casing setting depths and completion intervals. Consultant <br /> will review completion interval drilling and testing data and recommend if acid <br /> treatment is necessary, review acid treatment and testing plans. Consultant will <br /> review pump test results and provide recommendations for permanent pump <br /> setting depth and recommended in service pumping rate. <br /> Consultant will coordinate water quality testing, which includes clearance water <br /> quality in accordance with FDEP regulations and additional water quality for <br /> membrane projections. <br /> Consultant will provide contract document interpretation, shop drawing and pay <br /> request review and change order requests. These construction phase services <br /> assume the well location, and formation water disposal determined above will not <br /> change during construction. Shop drawing submittal will be reviewed for <br /> conformance with the intent of the contract documents. Shop drawing will be <br /> submitted directly to the Consultant. The Consultant will review the submittal and <br /> return copies to the contractor and Indian River County Utilities. <br /> KHA will prepare a well completion report for well #S-4, including a summary of <br /> the lithologic logs, field logs, hydrologic and water quality data, and preparation of <br /> figures, data, lithogic logs,and appropriate attachments. <br /> K:\WPB_CivilW44572029-Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.