The well completion report and data will be used for future well clearance when the <br /> wells are placed into service. Up to six (6) final copies of the report will be <br /> furnished to Owner. <br /> It is anticipated that the additional construction phase for the addition of well S-4 <br /> will extend the original schedule by three (3) months. <br /> The installation of the well pump, column piping, and electrical service for <br /> operation of the well #S-4 is assumed to be included under the drilling and <br /> rehabilitation phase. Consultant will attend additional progress meetings, up to <br /> two (2) additional onsite progress meetings to discuss progress, review construction <br /> related issues, and provide coordination where needed. <br /> Consultant will prepare and submit a FDEP certification of construction completion <br /> and request for clearance to place well #S-4 into operation (FDEP Form 62.- <br /> 555.900(9)). Record drawing information will be provided by the contractors and <br /> included with the certification package. <br /> SCHEDULE <br /> In general, the following schedule is anticipated and run concurrently with the <br /> current work order schedule and contractor schedule. <br /> Task 1 Prepare Design Docs 2 -3 weeks from Notice to Proceed (NTP) <br /> Task 2 Permitting 4 - 6 weeks after Task 1 <br /> Task 3 Coordination 2 week after documents prepared <br /> Task 4 Construction Phase 6 -8 months after Notice of Award to <br /> Contractor <br /> FEE SCHEDULE <br /> We will provide these services in accordance with our Continuing Services Contract <br /> Agreement for Professional Services dated November 15, 2011, with Indian River <br /> County. <br /> The Consultant will provide professional services for Task 1 through Task 4 on a <br /> lump sum fee basis as follows: <br /> K:\WPB_Civil\044572029-Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 5 of 6 <br />