MELVIN BUSH CONSTRUCTION, INC.
<br />Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders
<br />with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in
<br />the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at
<br />the Site which was not shown or indicated in the Drawings or Specifications or identified in the
<br />Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General
<br />Conditions.
<br />4.05 Upon a request directed to the ENGINEER (Christopher J. Kafer, Jr., P.E. 772-226-
<br />1221), OWNER will provide Bidder access to the Site to conduct such examinations,
<br />investigations, explorations, tests, and studies as Bidder deems necessary for submission of a
<br />Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon
<br />completion of such explorations, investigations, tests, and studies.
<br />4.06 This paragraph has been deleted intentionally.
<br />4 07 It is the responsibility of each Bidder before submitting a Bid to:
<br />A. examine and carefully study the Bidding Documents, including any Addenda and the other
<br />related data identified in the Bidding Documents;
<br />B. VISIT THE SITE AFTER CONTACTING THE ENGINEER (CHRISTOPHER J. KAFER,
<br />JR., P.E., (772) 226-1221) TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME
<br />FAMILIAR WITH AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE
<br />CONDITIONS THAT MAY AFFECT COST, PROGRESS, AND PERFORMANCE OF THE
<br />WORK;
<br />C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and
<br />Regulations that may affect cost, progress, or performance of the Work;
<br />D carefully study all reports of explorations and tests of subsurface conditions at or
<br />contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
<br />subsurface structures at or contiguous to the Site (except Underground Facilities) which have
<br />been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
<br />Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition,
<br />if any, at the Site which have been identified in the Supplementary Conditions as provided in
<br />paragraph 4.06 of the General Conditions;
<br />E. obtain and carefully study (or assume responsibility for doing so) all additional or
<br />supplementary examinations, investigations, explorations, tests, studies, and data concerning
<br />conditions (overhead, surface, subsurface, and Underground Facilities) at or contiguous to the
<br />Site which may affect cost, progress, or performance of the Work or which relate to any aspect of
<br />the means, methods, techniques, sequences, and procedures of construction to be employed by
<br />Bidder, including any specific means, methods, techniques, sequences, and procedures of
<br />construction expressly required by the Bidding Documents, and safety precautions and programs
<br />incident thereto;
<br />F. agree at the time of submitting its Bid that no further examinations, investigations,
<br />explorations, tests, studies, or data are necessary for the determination of its Bid for performance
<br />of the Work at the price bid and within the times and in accordance with the other terms and
<br />conditions of the Bidding Documents;
<br />00200 - 3
<br />F::Public Works!ENGINEERING DMSION PROJECTS11363 69th St Bridge e Lal G Canal -Culvert tnstalMdmin!bid documents'F ster Contract DocunenIs100200 -
<br />Instructions to Bidders REV 04-07.doc Rev. 05101
<br />00200 - Instructions to Bidders REV 04-07
<br />
|