My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-151A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-151A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 3:56:19 PM
Creation date
1/12/2017 12:00:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/07/2014
Control Number
2014-151A
Agenda Item Number
8.D.
Entity Name
Melvin Bush Construction
Subject
Contract and Specifications
69th Street Bridge
Area
69th St. Bridge over I.R.F.W.C.D. Lateral G Canal
Project Number
1363
Bid Number
2014045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MELVIN BUSH CONSTRUCTION, INC. <br />G. become aware of the general nature of the work to be performed by OWNER and others <br />at the Site that relates to the Work as indicated in the Bidding Documents; <br />H. correlate the information known to Bidder, information and observations obtained from <br />visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; <br />I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br />resolution thereof by ENGINEER is acceptable to Bidder; and <br />J. determine that the Bidding Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for the performance of the Work. <br />4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br />premised upon performing and furnishing the Work required by the Bidding Documents and <br />applying any specific means, methods, techniques, sequences, and procedures of construction <br />that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br />given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br />has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br />acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br />convey understanding of all terms and conditions for performing and furnishing the Work. <br />ARTICLE 5 - PRE-BID CONFERENCE <br />5.01 THERE WILL BE NO PRE-BID CONFERENCE FOR THIS PROJECT. <br />ARTICLE 6 - SITE AND OTHER AREAS <br />6.01 The Site is identified in the Bidding Documents. All additional lands and access <br />thereto required for temporary construction facilities, construction equipment, or storage of <br />materials and equipment to be incorporated in the Work are to be obtained and paid for by <br />CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br />are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br />ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br />7.01 All questions about the meaning or intent of the Bidding Documents are to be <br />submitted to PURCHASING (purchasing( ircgov.com) in writing. Interpretations or clarifications <br />considered necessary by ENGINEER in response to such questions will be issued by Addenda <br />mailed or delivered to all parties through the Issuing Office as having received the Bidding <br />Documents. Questions received less than ten days prior to the date for opening of Bids may not <br />be answered. Only questions answered by Addenda will be binding. Oral and other <br />interpretations or clarifications will be without legal effect. <br />7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as <br />deemed advisable by OWNER or ENGINEER. <br />00200 - 4 <br />F:1Public Works\ ENGINEERING DIVISION PROJECTSt1363-69th SI Bridge (id fiat G Canal -Culvert InstalhAdmintbid documents\Mester Contract Documents t00200 - <br />Instructions to Bidders REV 04-07.dac Rev 05/01 <br />00200 - Instructions to Bidders REV 04-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.