Laserfiche WebLink
ANSWER NO. 5 <br />Yes. VMS boards 2 weeks prior to closure. <br />QUESTION NO. 6 <br />Testing appears to be the Contractor's responsibility. Please confirm. <br />ANSWER NO. 6 <br />Testing will be paid for by the County. Contractor will pay for failed tests. <br />QUESTION NO. 7 <br />Is there an estimated construction cost for bonding purposes? <br />ANSWER NO. 7 <br />The cost estimate is $227,353. <br />CLARIFICATIONS <br />The Contractor will be required to install the canal pipes in a dry condition. This would require the <br />Contractor to sheet off the canal upstream and downstream and provide an adequate bypass pump <br />system (as determined by Indian River Farms Water Control District). The discharge from the bypass <br />pump system will be required to go into a temporary structure to dissipate the energy of the discharge. <br />Copies of permits for this project are included with this Addendum No. 2. Contractor is responsible to <br />comply with all conditions of the permits. <br />ATTACHMENTS: <br />1. St. Johns River Water Management District Permit No. GEN -061-138803-1 <br />2. Indian River Farms Water Control District Permit No. 14-15 <br />Page 3 of 4 <br />