My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-154
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 3:57:59 PM
Creation date
1/12/2017 1:46:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2014
Control Number
2014-154
Agenda Item Number
8.M.
Entity Name
Masteller & Moler
Subject
Blue Cypress Lake Wastewater Treatment Plant
Work Order No.8
Area
West Regional Wastewater
Bid Number
2012010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order #8 <br />Exhibit #1 (Scope of Work) <br />Page 2 <br />• Scope of Services <br />Masteller & Moler, Inc. will prepare and submit the FDEP permit revision application package and <br />complete project design, construction plans, specifications and bid documents, and provide <br />services during bidding and construction. Our services will include obtaining soils engineering <br />services as necessary to produce a bid ready project and prepare an abandonment plan and <br />criteria for demolition and removal of the existing steel package wastewater treatment plant. <br />Task A — Permitting Services <br />Masteller & Moler, Inc. will prepare the FDEP permit revision application package to provide for the <br />construction of a new 17,000 GPD replacement package tertiary treatment plant. We will prepare <br />an Abbreviated Preliminary Engineering Report as part of the permit revision application package <br />and submit the application to FDEP along with the Indian River County application fee check in the <br />amount of $600.00. <br />Task B — Engineering Services <br />Masteller & Moler, Inc. will provide engineering design services of a new replacement 17,000 GPD <br />package concrete wastewater treatment plant on the existing site without disturbing the existing <br />plant. Our services will include preparation of construction plans and specifications with bid <br />documents showing and describing the new plant which will include surge tank, duplex aeration <br />tanks, dual final clarifier tanks, aerated digester tank, dual cell tertiary filters, and duplex chlorine <br />tanks. The new plant process will be extended aeration with Class 3 reliability and be designed to <br />meet existing FDEP effluent requirements. The plans and specifications will include related <br />treatment plant equipment and piping such as pumps, blowers, bar screen with splitter box, and a <br />hypochlorination system. The existing effluent disposal facilities will be utilized. The plans will <br />include modifications to the effluent disposal system as required by the FDEP. <br />Task C — Project Bidding Services <br />Masteller & Moler, Inc. will work with Indian River County to allow for bidding of the proposed <br />construction work to be described in the Contract Plans and Technical Specifications. We shall <br />attend a Pre-bid Meeting to describe the project to bidding contractors. We shall review the bids to <br />be received by the County Purchasing Department and make a recommendation for award of the <br />contract to the lowest qualified bidder. <br />Task D — Periodic Construction Observation and Administrative Services <br />Masteller & Moler, Inc. will provide periodic observation of construction of the improvements <br />described above on an as -needed basis to observe that construction is in reasonable compliance <br />with the Contract Plans. We will also attend meetings, review shop drawings and monthly pay <br />estimates from the Contractor. Following successful completion of the Contract work as evidenced <br />by as-builts and testing by the selected Contractor, we shall prepare Engineer's Certificates <br />confirming that the project improvements have been constructed in substantial conformance with <br />design plans and specifications. <br />As part of our services related to the new plant start-up, we shall include in the specifications a <br />narrative describing the transition of the flow and "seeding" the new plant as part of taking the <br />existing plant off-line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.