Laserfiche WebLink
Work Order #8 <br />Exhibit #1 (Scope of Work) <br />Page 3 <br />Task E — Soils Engineering Services <br />Masteller & Moler, Inc. will provide for soil borings and a report of findings and recommendations to <br />support the design and construction of the new replacement wastewater treatment plant. <br />Task F — Abandonment Plan <br />Masteller & Moler, Inc. will prepare and include in the project bid package specification an <br />Abandonment Plan (AP). The AP will present the procedures for closing the existing wastewater <br />treatment plant that will be removed from the site once operation is discontinued. This plan will also <br />include sequential steps of action for wastewater and solids removal, cleaning and disinfection of <br />tanks, demolition and removal of the existing steel package wastewater treatment plant, and the <br />time frames associated with the cleaning and demolition procedures. <br />