Laserfiche WebLink
Exhibit#1 (Scope of Worts) WO#7 <br /> 08/25/2014 Sewer Design For N. Sebastian Area <br /> Page 3 File#1422 <br /> Task A—Civil Engineering Services <br /> Masteller & Moler, Inc. will provide final design, prepare construction plans and permit <br /> applications for the project as described in the "Scope of Services"section of this proposal. <br /> Task B—Surveying Services <br /> Masteller, Moler& Taylor, Inc. will perform surveying services for the project as follows: <br /> 1) Project initiation, including review of existing deeds and surveys, files and field notes, <br /> preparation of work orders and field crew folders. <br /> 2) Find, recover and measure field ties into existing survey control along the route to <br /> establish the rights of way and baseline of survey. Tie Horizontal Control to Florida <br /> State Plane Coordinate System, Florida East Zone, NAD 83. <br /> 3) Find and recover existing vertical control. Elevations shall be based upon the North <br /> American Vertical Datum of 1988 (NAVD 88) with a conversion to the National <br /> Geodetic Vertical Datum of 1929 (NGVD 29) provided. Perform bench run and <br /> establish benchmarks along the survey corridor at maximum 1,000 foot intervals. <br /> 4) Field monument baseline control at maximum 1,000 foot intervals. Control points shall <br /> consist of iron rod and cap or nail and disk. Control points shall be designated on <br /> survey with station/offset and NAVD `88 elevation. <br /> 5) Field locate and record vertical ground elevations sufficient to generate a center line of <br /> road profile for the main corridor and side streets and all distinct locations (inverts, <br /> retention areas, swales, ditches etc) and changes in contour along the right of way <br /> corridor. Obtain ground elevation on each property in center of lot if vacant or near <br /> existing septic location to the best of our abilities. If septic location not obtainable, <br /> obtain ground elevation near existing main building. <br /> 6) Field locate and record existing improvements and man-made features within the right <br /> of way, including but not limited to, roads, swales, driveways, culverts, signage and <br /> mailboxes, visible utilities, fences etc. within the existing Right-of-Way. <br /> 7) Field locate and identify limits of vegetation and trees, 4" or larger within the right of <br /> way limits. <br /> 8) Locate and obtain ground elevation at approximately (10) soil borings locations as <br /> determined by the engineer. <br /> 9) Process field data and determine limits of existing North Central Avenue, Davis Street, <br /> Madison Street, Jackson Street, U.S. Highway # 1 and Roseland Road right-of-ways. <br /> Prepare survey drawing in accordance with Minimum Technical Standards including <br /> cover sheet with location sketch, related title and project number, notes, legend, <br /> abbreviations and plan view sheets. Prepare final deliverables. <br /> 10) Research property description, deeds etc. for proposed easement and prepare one <br /> legal description and sketch as applicable Location to be determined by the engineer. <br /> i <br />