My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-155
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 2:01:11 PM
Creation date
1/12/2017 2:01:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2014
Control Number
2014-155
Agenda Item Number
12.G.1
Entity Name
Masteller & Moler
Subject
North Sebastian Sewer Design Phase 1 Commercial
Work Order No.7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit#1 (Scope of Work) WO#7 <br /> 08/25/2014 Sewer Design For N. Sebastian Area <br /> Page 4 File#1422 <br /> Task C—Soils Engineering Services <br /> KSM will perform soil engineering services for the project as follows: <br /> Perform fifteen (15) soil borings, twelve (12) to a depth of 10', one (1) to a depth of 15' and <br /> two (2) to a depth of 25' below existing grade in order to classify the soils in accordance <br /> with the unified soil classification system and specify the groundwater water table and <br /> normal estimated seasonal high groundwater table at each location. The locations will be as <br /> indicated on the aerial provided by Masteller& Moler, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.