Laserfiche WebLink
SCS ENGINEERS <br />FEE SCHEDULE (Continued) <br />(Effective October 1, 2014 through November 16, 2017) <br />Page 4 <br />EQUIPMENT/FIELD SUPPLIES <br />Landfill Gas Field Equipment <br />Wellhead <br />Blower on Skid <br />Rate ($) Unit <br />15 <br />45 <br />Day <br />Day <br />Media Measurement Equipment: <br />Conductivity Meter * 15 Day <br />Draeger Air Screening System * 20 Day <br />DO Meter* 15 Day <br />GasTech Gas Meter 50 Day <br />GEM Soil Gas Meter 125 Day <br />Heath Porta FID II OVA * 50 Day <br />Horiba U-10 Water Quality Meter 60 Day <br />Oil/Water Interface Probe 25 Day <br />pH Meter * 15 Day <br />Temperature Meter * 15 Day <br />Tier 2 Gauge 50 Day <br />Turbidity Meter * 15 Day <br />Water Level Indicator * 15 Day <br />YSI Cond/Temp/Salinity Meter * 50 Day <br />Miscellaneous Equipment: <br />Absorbent Material 15 Cubic Foot <br />Air Compressor 60 Day <br />Camera 10 Day <br />Cordless Saw 20 Day <br />Generator 60 Day <br />Global Positioning System (GPS) 45 Day <br />Hammer Drill 15 Day <br />Laser Level Surveying Package 75 Day <br />Power Inverter 10 Day <br />Regent Lighting* 5 Day <br />Ryobi Drill 7 Day <br />Silicon Tubing * 2 Foot <br />Teflon Tubing * 4 Foot <br />