Laserfiche WebLink
SCS ENGINEERS <br />FEE SCHEDULE (Continued) <br />(Effective October 1, 2014 through November 16, 2017) <br />Page 5 <br />EQUIPMENT/FIELD SUPPLIES Rate ($) Unit <br />Traffic Control Cones * 5 Day <br />Transit Level Surveying Package 50 Day <br />Tygon Tubing * 2 Foot <br />Video Camera 50 Day <br />Walky Talkys* 10 Day <br />Soil Sampling Equipment: <br />Hand Drill Auger System 25 Day <br />Sampling Tube - Acrylic, SS 5 Day <br />Slide Hammer * 10 Day <br />Bar Punch 10 Day <br />SS Bowls, Spoons, Scoops, etc. * 5 Day <br />SS Hand Auger - Bucket, Dutch * 10 Day <br />Water Sampling Equipment: <br />QED Micropurge w/Flow Cell* <br />Reusable Teflon Bailer/Lanyard * <br />* = Included in standard sampling trailer <br />rental. <br />200 <br />5 <br />Day <br />Day <br />